Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a mixed-use development in Bowling Green, Ohio. Completed plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; for paving for a transportation facility; and water / sewer project.
https://bgindependentmedia.org/runway-expansion-6-2m-to-make-it-safer-for-multi-engine-planes-to-land-during-strong-north-south-winds/ An extended runway at Wood County Regional Airport could help expand training for students getting their wings. On Tuesday, the airport board President Jamie Weidner asked the Wood County Commissioners for a line of credit to cover the local match for the $6.2 million runway expansion. The project will lengthen the north-south runway from 2,600 feet to 3,200 feet long, and widen it from 50 to 60 feet, according to airport Manager Mark Black. The current runway accommodates small single-engine planes and multi-engine planes being flown by experienced pilots. But a longer runway is needed if student pilots in the BGSU Flight Program land multi-engine planes on that runway, Black said. “It will be a lot safer for them to train on,” Black said. Aerial view of Wood County Regional Airport, showing longer east-west runway The airport’s current east-west runway is 4,200 feet, and can accommodate student pilots taking off and landing multi-engine flights. However, if there are strong winds from the north or south, the planes should use a north-south runway rather than try to land in a stiff crosswind, Weidner explained. The approach for landing is from the south, over Poe Road. So in order to meet FAA design standards for a multi-engine runway, the airport board has already secured an easement from BGSU to no longer allow parking on the south side of Poe Road. “This will be more viable for everybody, especially if the winds are strong out of the south or strong out of the north,” Weidner said. The FAA is partnering with the Wood County Regional Airport, and will be picking up 90% of the $6.2 million project. The state will pay 5%, leaving 5% for the local match. Although the airport board has already raised the matching dollars, pre-funding from the county commissioners would reportedly help to move the excavation and drainage portions of the project forward this year. Weidner explained to the county commissioners that the airport board had already checked off several boxes for the project, such as pre-funding the design, completing an environmental assessment, and getting the easement from BGSU for the parking lot area south of Poe Road. The board is also in the process of acquiring a small parcel of land on the northeast side of the airport from the homeowner. That will allow the expanded north-south runway to meet “line of visibility” requirements for the east-west runway, Black said. It is hoped the runway extension can be completed by late summer of 2025. The airport board is also interested in building more hangar space to attract more pilots in the area to store their planes at the Bowling Green airport. However, the FAA only shares in the construction costs for hangars if all the paving needs are met at the airport, according to Weidner. Since paving updates are ongoing, it’s unlikely hangar funds will be available from the FAA. “As soon as we’re done with the north-south runway, our east-west runway is in need of repair,” Weidner said. The Wood County Regional Airport site currently has one larger hangar, and three T-hangars that can house up to 10 planes each. -------------------------------------------------------------------------------------- Work items include earthwork, drainage, asphalt pavement, markings, edge lighting, NAVAIDs and seeding, associated with the widening and extension to Runway 18/36, and Taxiway C extension. Contract questions shall be directed to Mr. Ben Cooley of Crawford, Murphy and Tilly, Inc at 614.468.1205 or bcooley@cmtengr.com. The certificates of insurance, including evidence of the required endorsements hereunder or the policies, shall be filed with the Owner within Twenty (20) days after the date of the receipt of Notice of the Award of the Contract to the Contractor and prior to the start of the work. All insurance policies shall provide thirty (30) days written notice to be given by the insurance company in question prior to modification or cancellation or non-renewal of such insurance. Such notices shall be mailed, certified mail, return receipt requested, to: Mr. Mark Black Wood County Regional Airport Authority 1261 E Poe Road Bowling Green, OH 43402
Bid Results
Transportation Terminals
$200,000.00
Public - County
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 14, 2024
June 13, 2024
1261 E Poe Rd, Bowling Green, OH
Related To This Project
Bowling Green, OH
Bid Date: Jun 05 2024
Bowling Green, OH
Bid Date: Jun 06 2024
Bowling Green, OH
Bid Date: Jun 10 2024
Bowling Green, OH
Bid Date: Jun 11 2024
Bowling Green, OH
--
Bowling Green, OH
Bid Date: Aug 28 2024
Bowling Green, OH
Bid Date: Jul 25 2024
Bowling Green, OH
--
Bowling Green, OH
--
Bowling Green, OH
Bid Date: Apr 30 2024
Bowling Green, OH
Bid Date: Apr 22 2024
Bowling Green, OH
Bid Date: May 06 2024
Bowling Green, OH
Bid Date: May 06 2024
Bowling Green, OH
Bid Date: Apr 08 2024
Bowling Green, OH
Bid Date: Apr 05 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.