BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and new construction of a transportation facility in Coronado, California. Conceptual plans call for the demolition of a 2,625-square-foot, one-story above grade transportation facility; and for the construction of a 4,900-square-foot, one-story above grade transportation facility.

BUILDING REQUIREMENTS 1. Construct a new 1-story Air Terminal of approximately 4,900 square feet (not to exceed 5,000 SF) footprint at San Clemente Island (SCI) to replace deteriorated existing 2,625 SF facility that is beyond its service life. New air terminal shall be considered a Category 1A small terminal, per Passenger Terminal Facility Design Guide, with expected peak 3- hour passenger load under 100 passengers. New facility shall be sited such that set back distance from TARMAC of 100 feet is met. Building Type Building shall have CMU enclosure and pre-finished aluminum roof to withstand the harsh marine climate. Building envelope shall be designed and constructed to meet energy requirements. Building plan shall incorporate spaces as noted in Room Requirements and as shown in Concept Plan. Contractor shall provide a permanent means of roof access with a lockable cover. Building systems shall include electrical, HVAC, plumbing, sewer, fire protection, fire alarm, phone/data communications, and MNS. Interior shall be finished per C30. FF&E package is part of this project. BASE ITEM 0001 Firm Fixed Price (Lump Sum) including all labor, equipment, materials, transportation, supervision, permits, bond costs and incidental work related to providing for Design Build construction to Repair/Replace Air Terminal at San Clemente Island, Naval Base Coronado, California. This also includes bond costs, overhead, and profit, complete in accordance with the Plans and Specifications and all amendments. The period of Performance (POP) is 495 calendar days (including 15 days for bond submittal) from Task Order award. LOCATION The place of performance is San Clemente Island Naval Base Coronado, CA. The Contractor shall provide all labor, materials, equipment, supervision and transportation to design and build an Air Terminal at SCI, NBC. All inquiries concerning any part of this solicitation shall be made to CS Genard Cayanan at Genard.g.cayanan.civ@us.navy.mil All RFIs shall be submitted no later than 4:00 PM , Pacific Standard Time (PST), on 8 May 24 via email to genard.g.cayanan.civ@us.navy.mil . Any RFIs submitted after the cutoff date may not receive a response.

Project Abandoned

Transportation Terminals

$5,000,000.00

Public - Federal

Demolition, New Construction

9

11

37

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
77
Bidding Soon
1,100
All Active Projects
549
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 24, 2024

September 24, 2024

img_map_placeholder

To Be Determined, Coronado, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.