BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Perry, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Resurfacing and repairs of various city streets and county roads in Byron, Centerville, Perry, Warner Robins, Houston County Totaling 21.20 miles. SCOPE OF THE WORK: The Work includes the furnishing of all necessary machinery, equipment, tools, labor and other construction means, and all materials and equipment required to perform the Work and including the placing of the Work into satisfactory operation. LOCATION: The work under this Contract will be located in Byron, Centerville, Perry, Warner Robins, and Houston County, Georgia. Begin at Walker Road and end at Oakridge Drive 1- Adjust MH & WV as needed 2- 179 tons ofOGI asphalt at 1" <110 LB/5Y) 3- 268 tons of 12.5 MM asphalt at 1 %" (165 LB.'SY) 4- 5:1 Double-Yellow Paint centerline, full length 5- 2 - 24:' Thermo Stop Bars PINE RIDGE DRI\T Pine Ridge Drive begins at St. Rt. 49 and ends at Walker Road (Areas for topping to be marked by city engineer) 1 - Adjust MH & WV as needed 2- 128 tons of 9.5 MM asphalt at 1 %" (135 LB/SY) spot overlay (2 locations) 3- 5" Double-Yellow Paint centerline, full length ofroad 4- 5" White Paint edge line, full length ofroad 5- Place/refurbish 24" Thermo Stop Bars at both ends and on all side streets OAK RIDGE DRIVE Begin at Walker Road and end at 300' east of Walker Road (Leveling area and paving area to be marked by city engineer) 1- Adjust MH & WV as needed 2- 14 tons ofleveling at 60 lb./Sq Yd 3- 50 tons of9.5 MM asphalt at 1 %" (135 LB/SY) 4- 5" Double-Yellow Paint centerline, full length of new paving 5- 5" White Paint edge line, full length of new paving <5- 1 - 24" Thermo Stop Bar ACORN COURT Begin at Red Oak Road and end at Cul-de-sac (Including cul-de-sac) 1- Adjust MH & WV as needed 2- 83 tons of 9.5 MM asphalt at 1 *A" (135 LB/SY) 3- Install 1 - 24" Stop Bar WILLOW OAK WAY Begin at Red Oak Road and end at Majestic Oak Circle24" Stop Bai 1- Restore 5" Double-Yellow Paint centerline, full length 2- 2 - 24" Thermo Stop Bars NORTH TWIN OAKS COURT Begin at Majestic Oak Circle and end at cul-de-sac (Including cul-de-sac) 1- Adjust MH & WV as needed 2- 78 tons of 9.5 MM asphalt at 1 %" (135 LB/SY) 3- 1 - 24" Thermo Stop Bar SOUTH TWIN OAK COURT Begin at Majestic Oak Circle and end at Cul-de-sac (including cul-de-sac) 1 - Adjust MH & WV as needed 2- 85 tons of 9.5 MM asphalt at 1 %" (135 LB/SY) 3- 1 - 24" Thermo Stop Bar All bids must be accompanied by a Bid Bond in the amount not less than ten percent (10%) of the Total Base Bid. Performance and Payment Bond, each in the amount of one hundred percent (100%) of the total contract amount, will be required of the successful bidder. Bonds must be written by an acceptable Surety Company licensed to do business in the State of Georgia and listed in the Department of Treasury, Circular 570, latest edition. The bidder's online Number shall be marked on the outside of the bid envelope. A completed "online Affidavit for Road Construction" shall be included with the bid. All potential bidders must be GDOT prequalified The Joint 2024 LMIG Committee reserves the right to accept or reject any or all bids and to waive technicalities. Question Deadline 05/20/2024 All questions about the meaning or intent of the Bidding Documents are to be directed to Owner.

Post-Bid

Roads / Highways

$700,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
26
Bidding Soon
387
All Active Projects
196
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2024

June 24, 2024

img_map_placeholder

Multiple Locations, Perry, GA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.