Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Perry, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Resurfacing and repairs of various city streets and county roads in Byron, Centerville, Perry, Warner Robins, Houston County Totaling 21.20 miles. SCOPE OF THE WORK: The Work includes the furnishing of all necessary machinery, equipment, tools, labor and other construction means, and all materials and equipment required to perform the Work and including the placing of the Work into satisfactory operation. LOCATION: The work under this Contract will be located in Byron, Centerville, Perry, Warner Robins, and Houston County, Georgia. Begin at Walker Road and end at Oakridge Drive 1- Adjust MH & WV as needed 2- 179 tons ofOGI asphalt at 1" <110 LB/5Y) 3- 268 tons of 12.5 MM asphalt at 1 %" (165 LB.'SY) 4- 5:1 Double-Yellow Paint centerline, full length 5- 2 - 24:' Thermo Stop Bars PINE RIDGE DRI\T Pine Ridge Drive begins at St. Rt. 49 and ends at Walker Road (Areas for topping to be marked by city engineer) 1 - Adjust MH & WV as needed 2- 128 tons of 9.5 MM asphalt at 1 %" (135 LB/SY) spot overlay (2 locations) 3- 5" Double-Yellow Paint centerline, full length ofroad 4- 5" White Paint edge line, full length ofroad 5- Place/refurbish 24" Thermo Stop Bars at both ends and on all side streets OAK RIDGE DRIVE Begin at Walker Road and end at 300' east of Walker Road (Leveling area and paving area to be marked by city engineer) 1- Adjust MH & WV as needed 2- 14 tons ofleveling at 60 lb./Sq Yd 3- 50 tons of9.5 MM asphalt at 1 %" (135 LB/SY) 4- 5" Double-Yellow Paint centerline, full length of new paving 5- 5" White Paint edge line, full length of new paving <5- 1 - 24" Thermo Stop Bar ACORN COURT Begin at Red Oak Road and end at Cul-de-sac (Including cul-de-sac) 1- Adjust MH & WV as needed 2- 83 tons of 9.5 MM asphalt at 1 *A" (135 LB/SY) 3- Install 1 - 24" Stop Bar WILLOW OAK WAY Begin at Red Oak Road and end at Majestic Oak Circle24" Stop Bai 1- Restore 5" Double-Yellow Paint centerline, full length 2- 2 - 24" Thermo Stop Bars NORTH TWIN OAKS COURT Begin at Majestic Oak Circle and end at cul-de-sac (Including cul-de-sac) 1- Adjust MH & WV as needed 2- 78 tons of 9.5 MM asphalt at 1 %" (135 LB/SY) 3- 1 - 24" Thermo Stop Bar SOUTH TWIN OAK COURT Begin at Majestic Oak Circle and end at Cul-de-sac (including cul-de-sac) 1 - Adjust MH & WV as needed 2- 85 tons of 9.5 MM asphalt at 1 %" (135 LB/SY) 3- 1 - 24" Thermo Stop Bar All bids must be accompanied by a Bid Bond in the amount not less than ten percent (10%) of the Total Base Bid. Performance and Payment Bond, each in the amount of one hundred percent (100%) of the total contract amount, will be required of the successful bidder. Bonds must be written by an acceptable Surety Company licensed to do business in the State of Georgia and listed in the Department of Treasury, Circular 570, latest edition. The bidder's online Number shall be marked on the outside of the bid envelope. A completed "online Affidavit for Road Construction" shall be included with the bid. All potential bidders must be GDOT prequalified The Joint 2024 LMIG Committee reserves the right to accept or reject any or all bids and to waive technicalities. Question Deadline 05/20/2024 All questions about the meaning or intent of the Bidding Documents are to be directed to Owner.
Post-Bid
Roads / Highways
$700,000.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 23, 2024
June 24, 2024
Multiple Locations, Perry, GA
Related To This Project
Perry, GA
Bid Date: May 10 2024
Perry, GA
Bid Date: Jun 06 2024
Perry, GA
Bid Date: May 23 2024
Perry, GA
Bid Date: Jul 30 2024
Perry, GA
Bid Date: Aug 08 2024
Perry, GA
Bid Date: Jun 10 2021
Perry, GA
Bid Date: Aug 06 2024
Perry, GA
Bid Date: May 14 2024
Perry, GA
Bid Date: May 01 2024
Perry, GA
Bid Date: May 16 2024
Perry, GA
Bid Date: Apr 23 2024
Perry, GA
Bid Date: Apr 24 2024
Perry, GA
Bid Date: Sep 07 2021
Perry, GA
Bid Date: Aug 26 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.