Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 27, 2024 at 8:00 PM

Updated June 28, 2024

Site work and paving for a civil project in Carrollton, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

This project will generally include all construction, labor, materials, administration, and associated activities required in conjunction with or properly incidental necessary for the following Replacement of approximately 19,800 SY of concrete pavement replacement along Perry Road from Walnut Avenue north to the existing bridge east of E. Russell Avene Replacement of approximately 2,500 LF of 8 inches water line, Perry Road from south of Spring Avenue to Sherwood Lane. Construction of approximately 174 LF of storm pipes at two different locations on Perry Road (Plan sheet 37 and 41) Replacement of storm sewer curb inlets on Perry Road. Construction of approximately 200 LF of gabion wall about 6 feet in height along south bank of Perry Branch Creek. A project time of 300 calendar days. Start Construction (no later than)* Monday, June 3, 2024 Finish Construction (no later than)* Sunday, March 30, 2025 PRE-BID QUESTIONS Pre-bid questions may be submitted via email ONLY at perry@cityofcarrollton.com until 5:00 PM on Wednesday, May 1, 2024

Post-Bid

Roads / Highways

$5,420,978.00

Public - City

Paving, Site Work

120

20

15

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
398
Active Projects
137
Bidding Soon
4,404
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2024

June 3, 2024

Project location map

N Perry Rd, Carrollton, TX

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed