BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Avon Park, Florida. Contact the soliciting agency for additional information.

Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) Selection Method : Expanded Letter of Response Financial Management Numbers : 41707413208 Project Description : DW Quality Assurance Plans Review Plain Language Description : The General Objective is for the Consultant to Perform the Quality Assurance Technical and Constructability Reviews of Construction Plans (Along With the Supporting Documentation) to Be Used by the Contractor to Bid and Build the Project, and by the Department to Ensure the Project is Built as Designed and to Specifications. The Types of Construction Plans to Be Reviewed May Include: Designs Prepared by Consultants or Fdot Staff for Interstate Highways, Highways on the State Road System and Streets Off the State Road System, Design-build, Roadway and/or Landscape Joint Project Agreement Projects (Jpa), Utility Work by Highway Contractor Jpa's, Local Agency Program (Lap) Projects, State Grants or Other Liaison Projects, Permits by Developers, or Local Agencies on the State Road System. Submitting Units or Offices May Include: Project Development, Consultant Project Management, Fdot in-house Roadway Design, District Construction, District Maintenance, Local Maintenance, District Utilities, Structures Design, and Structures Maintenance Office. Elements of Work Shall Include if Required, Roadways, Drainage, Intersection Improvements, Pedestrian/bicycle Facilities, Temporary Traffic Control Plans, Transportation Management Plan, Utility Adjustment Plans, Signing and Pavement Markings, Signalization, Lighting, Landscaping, Structures, Miscellaneous Highway Related Structures, Supporting Documentation Such as Design Documentation and Design Calculations, Cost Estimates, Quantity Computations and Any Other Necessary Incidental Items. Advertisement Date 4/30/2024 Response Deadline Date/Time 5/14/2024 02:30 am Shortlist Selection Date/Time 6/03/2024 07:00 pm Final Selection Date/Time 6/17/2024 07:00 pm Negotiations Period Begin Date 7/09/2024 Negotiations Period Ending Date 8/06/2024 The method of contractor selection has not been determined at this time. FDOT - RFP - DW Quality Assurance Plans Review

Conceptual

Roads / Highways

$1,500,000.00

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
67
Bidding Soon
1,338
All Active Projects
539
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2024

img_map_placeholder

Multiple Locations, Avon Park, FL


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.