BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Barksdale AFB, Louisiana. Completed plans call for the renovation of a municipal facility.

Project shall include the furnishing of all design, materials, labor, and equipment necessary to perform Title 1-B Design and Construction to repair BOLO Dorm, building 4351 at Barksdale AFB, Louisiana. Perform design and construction work in accordance with UFC, Statement of Work (SOW), Government Provided 35% Drawings Package that consist of 35% drawings (ACAD & PDF), HVAC Heat Load Analysis, Specifications Table of Contents and Base Standards (see attachments 1-5). Construction notice to proceed shall not be provided or onsite construction commence until 100% IFC stamped drawings are approved by the Government. Title 1-B Drawings and Specifications shall be designed in accordance with Unified Facility Criteria (UFC). The ACAD files will be provided to the contractor upon contract award. Since this a large scale project it will require one person as a full-time sight Superintendent as well as an additional person to be a full-time sight Quality Control Manager. The Architect-Engineer (A-E) shall perform Title 1-B Design services as identified herein. In general, the work will consist of design and repair of BOLO dorm in accordance with the 35% Design Package, this Statement of Work, and Base Standards (see attachments 1-5). This includes but is not limited to any Architectural, Civil, Structural, Mechanical, Electrical, Plumbing design and Fire Protection required to meet the specific requirements 1-B design services outlined below.

Post-Bid

Municipal

$560,000.00

Public - Federal

Renovation

75

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
17
Bidding Soon
227
All Active Projects
105
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2024

October 7, 2024

img_map_placeholder

4351 Barksdale Dr, Barksdale AFB, LA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.