Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 23, 2025 at 8:00 PM
Updated September 24, 2025
Site work for a municipal facility in Foxborough, Massachusetts. Working plans call for site work for a municipal facility.
As of September 23, 2025. The Town did not receive any quotes in response. No definite date for the rebid. Project The Town is seeking quotes from experienced, qualified contractors to remove and dispose of the existing hockey rink sidewall barriers and doors and install new sidewall rink barriers, doors, and associated equipment. The project is located at the Booth Recreation Complex at 80 South Street, Foxborough, MA 02035. All measurements must be verified in the field for accuracy and are the responsibility of the selected contractor. Services for the renovation of the existing barriers shall include the removal and replacement of approximately 360 feet (estimated) of existing barrier, framing, and door materials and shall include but not be limited to the following work: • Demolition, removal, and disposal of existing framing and boards. • Installation of 360 feet of new polyethylene arena side boards, framing, hardware, and associated equipment and materials around the perimeter of the existing hockey rink footprint. Work shall also include the installation of three doors, with associated hardware. o Boards shall be a minimum of 44 inches in height and topped with red trim, or as directed by Owner, and fit below the existing chain link fence barriers and white in color. o Doors shall be a matching height of the newly installed boards and fit below the existing chain link fence barriers in the approximate location of the older doors, or as directed by Owner. All doors shall come equipped with or have installed latching system. ? Door 1: Installed door shall be a minimum of 44 inches in height, 15 feet and 5 inches in length, and open outward. The new door shall maintain the current folding functionality. See Appendix A detailing the current door. ? Door 2: Installed door shall be a minimum of 44 inches in height and 29.5 inches wide and open outward into the corridor between the hockey rink and tennis courts. ? Door 3: Installed door shall be a minimum of 44 inches in height and 29.5 inches wide and open outward into the corridor between the hockey rink and tennis courts. Questions regarding Request for Quotes and scope of work due by: 05/08/2024 at 12:00 Noon
Final Planning
Municipal
$995,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
