BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Waterloo, Illinois. Completed plans call for site work for a water / sewer project.

The Project includes the following Work: Furnishing all labor, materials, and equipment required to clean, install, test, and render operational cured in place lining for approximately 114 L.F. of 6" sanitary sewer, 3,326 L.F. of 8" sanitary sewer, 447 L.F. of 10" sanitary sewer, 162 L.F. of 12" sanitary sewer, 570 L.F. of 15" sanitary sewer and all appurtenances including any bypass pumping and traffic control. The work shall be completed in accordance with the specifications and included plans covering the work. The Work will be substantially complete within 120 days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 150 days after the date when the Contract Times commence to run Contact information and submittal procedures for such questions are as follows: A. Jesse S. Maynard jmaynard@hmgengineers.com The Construction Contract for this project is subject to "An Act regulating wages oflaborers, mechanics and other workers employed in any public works by the State, County, City or any public body or any political subdivision or by anyone under contract for public works", approved June 26, 1941, as amended, being Section 820 ILCS 130/1-12 Illinois Compiled Statutes, commonly referred to as The Prevailing Wage Act. All questions shall be directed to Jesse S. Maynard at HMG Engineers, Inc. at (618) 687-0019 orjmaynard@hmgengineers.com The OWNER may make such investigations as he deems necessary to determine the ability ofthe BIDDER to perform the WORK, and the BIDDER shall furnish to the OWNER all such information and data for this purpose as the OWNER may request. The OWNER reserves the right to reject any BID ifthe evidence submitted by, or investigation of, such BIDDER fails to satisfy the OWNER that such BIDDER is properly qualified to carry out the obligations ofthe Agreement and to complete the WORK contemplated therein

Award

Water / Sewer

$212,215.00

Public - City

Site Work

7

10

6

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
31
Bidding Soon
817
All Active Projects
307
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2024

June 14, 2024

img_map_placeholder

Multiple Locations, Waterloo, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.