BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a mixed-use development in Rialto, California. Completed plans call for the renovation of a educational facility.

The Work consists of any and all labor, materials, goods, supplies, equipment, tools, utilities, temporary facilities, transportation, delivery services, and other services and things of any nature whatsoever as are expressly and impliedly necessary to timely and satisfactorily complete the Project: (i) in strict accordance with the Contract Documents; and (ii) not later than the Required Completion Date specified in the Master Schedule. The Work consists generally of the following: 1) Clean and prepare the roof deck. 2) Cut out all blistered and damaged foam and haul away all debris. 3) Re-foam designated roof area and grind new foam to blend with existing foam. 4) Power wash the entire roof deck. 5) Mask off as necessary to prevent overspray. 6) Re-coat the entire foam roof deck with 1 (one) coat of white elastomeric acrylic coating at a rate of 2 (two) gallon per 100 square foot. 7) Contingency pricing for all wood rot discovered during the tear-off. (18,869 sq. ft.) 8) Provide: CXD - Plywood, 3/4 Inch plywood, 2 x 6 x 12 framing, 2 x 4 x 12 framing, Screws, nails and flashing as needed . License Requirements B-General, and or C-39 Liquidated Damages $1000 Estimated Bid Value 150k Start/Delivery Date Monday, July 1, 2024 Project Duration 45 Days Online Q&A No Scope of Work. The Contractor shall, at its own cost and expense, furnish all construction and other services (including, but not limited to, all labor, materials, tools, equipment, services, administration, supervision, and incidental and customary work) necessary and appropriate to fully and adequately complete the Project in strict accordance with the Contract Documents (Work). Should any detail or dimension be inadvertently omitted from the Plans and Specifications, it shall be the Contractors responsibility to request from the Architect the required details or information and to perform the Work in conformance therewith so that, upon completion of the Work, it will be acceptable and ready for use by the District.

Award

Educational

$64,440.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
87
Bidding Soon
2,193
All Active Projects
984
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2024

June 28, 2024

img_map_placeholder

182 E Walnut Ave, Rialto, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.