EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 25, 2025 at 8:00 PM

Updated March 26, 2025

Site work for a water / sewer project in Brockton, Massachusetts. Completed plans call for site work for a water / sewer project.

Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Project Specifications: Remove existing tanks and properly dispose in accordance with all local, state and federal environmental and safety rules and regulations. Furnish and install five new storage tanks: (1/EA) 500-gallon waste oil tank (3/EA) 500-gallon service fluid tank (1/EA) 1,000-gallon DEF tank Furnish and install stainless steel piping from DEF tank to fuel/service bay where a new DEF dispensing system will also be furnished and installed by Contractor. Install five new dispensing pumps to the new tanks to provide fluid delivery throughout the shop to existing dispensing station locations. All existing piping will be repaired/adapted to attach to the new pumps. Remove existing and furnish/install new leak/high level detection and alarm system for all five new tanks. New alarm panel will be furnished and installed in the Maintenance Supervisor office. Waste oil pump out station will be furnished and installed on the waste oil tank. New pressurized waste oil caddies (2/EA), compatible with the waste oil pump out station, will be furnished. New dispensing reels, hoses, and dispensing guns will be furnished and installed in the existing service bays and fueling bay. All existing piping will be repaired/adapted to attach to the new pumps. Alternate 1: Lincoln LFC6000 (or approved equal) software complete with tank level monitoring, e-mail alerts, installation, training and the first 12 months of any applicable licensing and support fees. Requests for approved equals, requests for clarification and questions must be received by BAT in writing via email no later than Monday, January 13, 2025 at 4:00 PM. Email jmech@ridebat.com . The Disadvantaged Business Enterprise (DBE) participation requirements for this procurement are stated in the Standard Terms and Conditions. Although there is no specific DBE goal established for this procurement, BAT has adopted an annual goal for DBE participation in its overall contracting opportunities of 2.1%.

Award

Water / Sewer

$150,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements
Division 08 - Openings

Division 08 - Openings

Hardware
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators

Find More Local Projects

Within 75 Miles of This Project
352
Active Projects
202
Bidding Soon
2,550
All Active Projects
1,105
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2025

February 28, 2025

img_map_placeholder

1442 Main St, Brockton, MA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.