BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Conway, Arkansas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Faulkner County will be accepting sealed bids for resurfacing roads with a 2-part process. Step 1: rejuvenating mass crack treatment, and Step 2: type 3 high polymer micro surfacing, on various county roads. aulkner County is requesting competitive sealed bids to establish a contract for cape seal road resurfacing for the unincorporated area of Faulkner County Direct questions and requests for clarifications related to this bid to Ashlie West at (501) 450-4900. Faulkner County reserves the right to accept or reject any or all bids placed and waive formalities. DESCRIPTION OF WORK: There are approximately 24.7 road miles, 289,571 square yards, 6 individual roads to be resurfaced using the Arkansas Department of Transportation Special Provision Specifications. A (2) two-part process: Step 1: Rejuvenating Mass Crack Treatment Step 2: Type 3 High Polymer Micro Resurfacing. All quantities are estimated. Aggregate is estimated at 20 lbs. per square yard on step 1. Aggregate is estimated at 25 lbs. per square yard on step 2. Faulkner County reserves the right to lower quantities if excess amount of aggregate is having to be reclaimed. The Rejuvenating Mass Crack Treatment must be allowed to cure for a minimum of (5) five consecutive days prior to applying the Type 3 High Polymer Micro Resurfacing. The Type 3 High Polymer Micro Resurfacing must be applied within a maximum of (15) fifteen consecutive days after the Rejuvenating Mass Crack Treatment. All work, mixes, applications, and compactions must conform to ARDOT specifications (attachments A&B) and attachment C which amends table 4 of ARDOT Special Provision High Polymer Microsurfacing. Prior to any construction the contractor must provide Faulkner County with a complete Mix Design Specification covering the specific materials used on the projects. After approval, NO substitutions will be permitted, unless approved by Faulkner County. Faulkner County will inspect all construction, any weekend or holiday day work shall require prior approval. Traffic control and signage is the responsibility of the contractor and must conform to the Manual of Uniform Traffic Control Devices (M.U.T.C.D.) and subject to review by Faulkner County. One (1) lane of traffic shall be maintained at all times. All prep work, for example, shoulder cutting, clipping, leveling shall be the responsibility of the contractor. Contractor will be responsible for marking the center line of any marked roads with temporary marking tape. 4" x 12" foil backed yellow marking tape every 30' of resurfaced roadway. Faulkner County will be responsible for striping all permanent pavement markings. Contractor will be responsible for cleaning up all excess aggregate on resurfaced roads, to include, the extent of the right of way. Spoils shall not be left on shoulders or ditches. Contractor may retain spoils or coordinate with Faulkner County for disposal. All sub-contractors must be approved by Faulkner County. Contractor shall distribute notifications such as "door hangers" to each resident living on each road under construction, at least 24 hours prior to start of construction. Faulkner County reserves the right to stop construction if any of the above-mentioned agreements are not fulfilled.

Award

Roads / Highways

$1,997,476.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
19
Bidding Soon
253
All Active Projects
119
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2024

June 14, 2024

img_map_placeholder

Multiple Locations, Conway, AR

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.