BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and addition to a fire / police facility in Citronelle, Alabama. Completed plans call for the addition of a fire / police facility; for the demolition of a fire / police facility; and for site work for a fire / police facility.

Metal Building Addition for the Citronelle Fire Station One hundred eighty (180) consecutive calendar days are allowed for the construction of the project All bids must be on blank forms provided in the Contract Document book and submitted bound in said book in its entirety. A cashiers check drawn on an Alabama bank or a Bidders Bond, payable to City of Citronelle, Alabama, for an amount not less than five percent (5%) of the amount bid, shall be filed with the proposal. The bidders bond shall be prepared on the form specified and signed by a bonding company authorized to do business in the State of Alabama. A performance bond in the form and terms approved by the City in an amount not less than the contract price will be required at the signing of the contract. A labor and materials bond in the form and terms approved by the City in an amount not less than one-hundred percent (100%) of the contract price insuring payment for all labor and materials shall also be required at the signing of the contract. In addition, the Contractor must furnish to the City at the time of the signing of the contract a certificate of insurance coverage as provided in the specifications. No bids will be considered unless the bidder, whether resident or nonresident of Alabama, is properly qualified to submit a proposal for this construction in accordance with all applicable laws of the State of Alabama. This shall include evidence of holding a current license from the State Licensing Board for General Contractors, Montgomery, Alabama, as required by Chapter 8 of Title 34, of the Code of Alabama, 1975. In addition, nonresidents of the State, if a corporation, shall show evidence of having qualified with the Secretary of State to do business in the State of Alabama The bidder must provide their name, address, a copy of their current State Contractors License, and other information required by the Project Engineer in order to obtain a numbered set of Contract Documents, which will be assigned to that bidder. The Contract Documents are for that bidders exclusive use and a bid submitted by any other bidder using a numbered set which has not been assigned to them is automatically disqualified. This provision will not be waived. It is the bidders responsibility to verify with the Project Engineer no later than 72 hours prior to the bid time and date that they have received all addenda and other supplemental information issued by the Engineer during the bid period for use in preparing the bid. The right is reserved to reject any and/or all bids and to waive informalities in the bidding and to furnish any item of material or work to change the amount of said Contract. No bid shall be withdrawn for a period of sixty (60) days subsequent to the opening of bids without the consent of the City of Citronelle. Prior to starting construction, locate and verify existing utility information. Provide information of any discrepancies or conflicts of existing utilities. Verify and field locate service connection point for potable water, fire protection water, sewer service, and gas service. Provide written certification to the Engineer of completion of this work prior to starting work under this section.

Award

Fire / Police

$254,774.00

Public - City

Addition, Demolition, Site Work

18

9

4

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
39
Bidding Soon
516
All Active Projects
215
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2024

July 5, 2024

img_map_placeholder

To Be Determined, Citronelle, AL


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.