BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Mansfield, Massachusetts. Completed plans call for site work for a playground / park / athletic field.

The Town is seeking quotes from experienced, qualified contractors for the rehabilitation and sealing of the Booth Recreation Complex tennis courts located at approximately 80 South Street, Foxborough, MA 02035. Questions regarding Request for Quotes and scope of work due by: 05/08/2024 at 11:00 AM General Information Scope of Work The Town of Foxborough is seeking quotes from experienced, qualified contractors to furnish and apply an acrylic surface system to repair and reseal the tennis courts at the Booth Recreation Complex, 80 South Street, Foxborough, MA 02035. All measurements must be verified in the field for accuracy and are the responsibility of the selected contractor. The selected contractor must notify the Town via its Director of Recreation, Renee Tocci, at rtocci@foxboroughma.gov at least 48 hours in advance of the work. An optional site visit will be held at the complex on Tuesday, May 7, 2024 at 10:00 AM. All interested vendors should meet at the Booth Recreation Complex's tennis courts. Work shall generally consist of repairing and resealing approximately 1,500 square yards (estimated) of tennis courts and related items as specified herein, and includes, but is not limited to, the following: 1. Surface preparation 2. Court patch and repair and hairline crack filing and sealing 3. Court resurfacing 4. Court retexturing 5. Layout and striping of tennis court lines 6. Site cleanup The contractor shall furnish all materials, tools, equipment, labor and supervision necessary to complete the work as detailed in this RFQ. It is the intent of the Town that these specifications shall describe a complete repair or improvement and that when the work is completed the Contractor shall leave the job site in a neat and finished condition.

Award

Playgrounds / Parks / Athletic Fields

$35,350.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
306
Active Projects
149
Bidding Soon
2,841
All Active Projects
1,172
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2024

May 22, 2024

img_map_placeholder

80 South St, Mansfield, MA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.