BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Mansfield, Massachusetts. Completed plans call for site work for a water / sewer project.

Dustin-Prescott PFAS Treatment System and Wells Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Town of Mansfield, MA (Owner) invites Bidders to submit sealed Bids for Dustin-Prescott PFAS Treatment System and Wells, which includes all Work for a GAC system, including installation of Owner-furnished GAC vessels, furnishing, and installing associated piping, electrical Work, control system/SCADA upgrades, site and civil Work, construction of a concrete slab and installation of a pre-engineered metal building; process, chemical feed systems, drainage and mechanical system upgradesin the existing treatment building; upgradesto well buildingsincluding electrical equipment, at three well sites (Dustin Well #7, Prescott Well #8 and Prescott Well #9), water main connections to raw water main and installation of metering vaults at the new replacement wells at Prescott Wells 8 & 9; installation of owner-furnished generators at all three well sites and at the existing water treatment building; and all materials, equipment, services and construction inherent to the Work The Work includes labor, material and equipment, services required for construction, testing, and commissioning of the Project in accordance with the Contract Documents and as more specifically described in the Specifications and Drawings and includes, but is not limited to, the following principal features. 1. Work at new PFAS treatment Building a. Site piping including yard piping, stormwater structures and stormwater piping for the new pre-engineered metal building; b. Pre-engineered metal building; c. Concrete slab to support the pre-engineered metal building; d. Install process piping, electrical, plumbing, and associated systems. Furnish, install, and backwash GAC media necessary for PFAS system to be operational; e. Unloading, installation, start-up and testing of Owner-furnished granular activated carbon (GAC) vessels; f. Furnish and install bag filters, associated piping valves and fittings in the new building; g. SCADA Work including upgrades to the existing main control panel new PFAS control panel and installation of fiber optic cable. 2. Work related to existing Treatment building a. Selected demolition of existing chemical feed systems and mechanical systems for sodium hydroxide chemical storage tanks, transfer pumps, piping, valves and fittings; b. Selected demolition of existing chemical feed systems and mechanical systems for sodium hypochlorite chemical storage tanks, metering and transfer pumps, piping, valves, and fittings; c. Water heaters, emergency showers, and associated piping, valves, and fittings; d. Selected demolition and replacement of dehumidification equipment and associated ductwork in the existing treatment building; e. Re-routing of analyzer waste to the floor drains or to the infiltration basin. Questions may be submitted via email. Woodard & Curran, Inc. 40 Shattuck Road, Suite 110 Andover, MA 01810 Attn: Srivalli Sukuru Email: ssukuru@woodardcurran.com Subject: Dustin Prescott Treatment System . General Contractor Questions - 3:00 PM local time August 16th, 2024

Award

Water / Sewer

$10,311,648.00

Public - City

Site Work

157

36

72

6

Subscribe For Documents

98 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
306
Active Projects
161
Bidding Soon
2,844
All Active Projects
1,206
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2024

September 5, 2024

img_map_placeholder

To Be Determined, Mansfield, MA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.