Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 12, 2024 at 8:00 PM
Updated September 13, 2024
Site work for a civil project in Mansfield, Massachusetts. Completed plans call for site work for a water / sewer project.
Dustin-Prescott PFAS Treatment System and Wells. BUILDING FOOTPRINT AREA: 3,571 GSF Sub Bid Category Painting, Electrical, Plumbing, HVAC Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Town of Mansfield, MA (Owner) invites Bidders to submit sealed Bids for Dustin-Prescott PFAS Treatment System and Wells, which includes all Work for a GAC system, including installation of Owner-furnished GAC vessels, furnishing, and installing associated piping, electrical Work, control system/SCADA upgrades, site and civil Work, construction of a concrete slab and installation of a pre-engineered metal building; process, chemical feed systems, drainage and mechanical system upgradesin the existing treatment building; upgradesto well buildingsincluding electrical equipment, at three well sites (Dustin Well #7, Prescott Well #8 and Prescott Well #9), water main connections to raw water main and installation of metering vaults at the new replacement wells at Prescott Wells 8 & 9; installation of owner-furnished generators at all three well sites and at the existing water treatment building; and all materials, equipment, services and construction inherent to the Work The Project being bid is subject to Massachusetts General Laws, Chapter 149, Sections 44A-J. General Bidders must be certified by the Commonwealth of Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for sewage and water treatment plants. SubBidders must be DCAMM certified for their respective class of Work. Sealed Sub-Bids are required for the following classes of Work. Question Deadline 07/19/2024 at 3:00 PM ET All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing as follows. Questions may be submitted via email. Woodard & Curran, Inc. 40 Shattuck Road, Suite 110 Andover, MA 01810 Attn: Srivalli Sukuru Email: ssukuru@woodardcurran.com Subject: Dustin Prescott Treatment System Bid Result. PAINTING: Keltic Painting $137,270 HVAC: Waterline Industries Corp $147,677 PLUMBING: Waterline Industries Corp $127,677 ELECTRIC: Waterline Industries Corp $627,677
Award
Water / Sewer
$1,040,301.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 12, 2024
September 5, 2024
To Be Determined, Mansfield, MA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
