Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 14, 2024 at 8:00 PM

Updated July 8, 2025

Site work for a water / sewer project in Sandy Springs, Georgia. Completed plans call for site work for a water / sewer project.

This project involves stormwater infrastructure improvements located at Overton Drive NE and Balboa Court NE in the Oakridge Forest Subdivision in Sandy Springs, GA. The project involves the cured-in-place pipe (CIPP) lining of approximately 231 LF of 18" diameter corrugated metal pipe and 445 LF of 30'' diameter corrugated metal pipe. Questions Due Date: May 17th 2024, 5:00 PM EDT SCOPE OF SERVIES Oakridge Forest Subdivision Stormwater Improvements Phase 2 This project involves stormwater infrastructure improvements located at Overton Drive NE and Balboa Court NE in the Oakridge Forest Subdivision in Sandy Springs, GA. The project involves the cured-in-place pipe (CIPP) lining of approximately 231 LF of 18" diameter corrugated metal pipe and 445 LF of 30" diameter corrugated metal pipe. All associated work required with CIPP lining, including but not limited to, pipe cleaning and flushing, pre and post TV inspection and videography, liner installation, water for inversion, disposal of water, pipe gaskets (end seals), testing of liner, and cure tracking, as outlined in the CIPP Specifications within the planset, is included in the scope of work. Traffic maintenance will be required, and homeowner property access will need to be maintained. During construction, one lane of road shall remain open at all times unless otherwise approved. Utility locates necessary for project completion shall be the responsibility of the contractor.

Bid Results

Water / Sewer

$130,471.00

Public - City

Site Work

8

3

6

3

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2024

July 3, 2024

Project location map

Overton Dr NE & Balboa Ct NE, Sandy Springs, GA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed