BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a civil project in Jurupa Valley, California. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

Pre-Bid Meeting No Online Q&A Yes Q&A Deadline 05/17/2024 5:00 PM (PDT) This project aims to design a plan for widening Limonite Avenue from Bain Street to Homestead Street, including necessary drainage improvements. The scope of work will consist of the Plans, Specifications and Estimates (PS&E) Phase of the project. The existing conditions include two (2) travel lanes without curb and gutter. The proposed project widens Limonite Avenue to provide two (2) additional travel lanes, a raised center median and the addition of curb and gutter. An equestrian use trail will be added and located on the North side of the street while a multi-use path will be located on the South side. The project will include a culvert crossing at the Pyrite Channel located east of Bain Street and west of Beach Street. The plan must be designed according to Riverside County Flood Control and Water Conservation District (RCFC&WCD) Standards. In addition to the widening, the design shall raise the vertical roadway design profile to accommodate the culvert crossing while providing clearance for existing and proposed utilities. A draft set of the Limonite Avenue widening plans was previously prepared and deemed 90 percent complete and will be included for reference. CAD files will be made available to the selected consultant. Since completing the 90% design, the Riverside County Flood Control District has completed the Draft Pyrite Area MDP Study which identified greater flows than originally accounted. The culvert will need a new stand-alone design set of plans. Previous street improvement, the right of way, environmental documents and utility information will be included for reference.

Conceptual

Roads / Highways

$1,914,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
102
Bidding Soon
2,234
All Active Projects
1,006
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2025

img_map_placeholder

Limonite Ave, Jurupa Valley, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.