BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 5, 2024 at 8:00 PM

Updated June 6, 2024

Site work and paving for a transportation facility in Carrollton, Georgia. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

Please note that bids will only be considered by those bidders and subcontractors currently prequalified with the Georgia Department of Transportation. This project is an overlay of the existing asphalt runway (approximately 48,000 sy) with milling at the connection point of the runway and apron. The project uses GDOT Open Graded Crack relief interlayer (OGI) and 12.5mm recycled asphaltic concrete surface course. Question Deadline May 29, 2024 The location of the work is at the West Georgia Regional Airport, Carrollton, Georgia. A Bidder's bond must be executed on the form furnished by the Sponsor, and the required bond, cash, cashier's check, or certified check must accompany each proposal, in the amount of 5% of the total amount of the proposal. A 100% performance bond and a 100% payment bond will be required of the Contractor at time of contract execution. A Georgia Resident Agent must countersign all bonds from a surety company authorized by law to do business in this State pursuant to a current certificate of authority to transact surety business by the Commissioner of Insurance; no bond shall be approved unless the surety is on the United States Department of Treasury's list of approved bond sureties. All work under the contract shall be completed within FORTY-FIVE (45) Calendar Days from the issuance of the notice to proceed. Liquidated Damages: Liquidated damages for delays in completion will be One Thousand Five Hundred Dollars ($1500.00) per calendar day. Payment will be made monthly on completed work. Retainage will be held by the Sponsor to a maximum of ten percent (10%) of each progress payment. Bids will be required to remain open for acceptance or rejection for one hundred and twenty (120) calendar days after the date of opening of bids. The bidder shall make good faith efforts, as defined in Appendix A of 49 CFR Part 26, Regulations of the Office of the Secretary of Transportation, to subcontract 10.30% percent of the dollar value of the prime contract to small business concerns owned and controlled by socially and economically disadvantaged individuals (DBE). The Right to Reject Any or All Bids and to Waive Informalities is Reserved To the Sponsor.

Bid Results

Transportation Terminals

$1,605,682.00

Public - Federal

Paving, Site Work

40

8

12

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
153
Bidding Soon
2,074
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2024

September 24, 2024

Project location map

635 Regional Airport Rd, Carrollton, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.