BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a multi-residential development in Newton, Mississippi. Completed plans call for the renovation of a multi-residential development.

2023 Phase IV UFAS /ada Renovations at Project 030-003 {decatur, MS), Project 030-010 & 030-017 (Taylorsville, MS), Project 030-019 (Bay Springs, MS) No bidder may withdraw his bid within 45 days after the date set for the opening thereof, and each bidder must comply with the laws of the State of Mississippi and all local laws relative to the performance of said work. Award will be made to the lowest responsible and responsive bidder whose bid meets the requirements of this Invitation for Bids. The Mississippi Housing Authority V, Newton, MS reserves the right to reject any and all bids or to waive any informalities in the bidding. All work listed below is for the (1) H/C Dwelling Unit: Sitework: Repair all areas of site damaged during construction including but not limited to ruts, concrete, etc.... Demo/Remove designated portion of existing sidewalks, parking pads, etc... and construct new as indicated. Construct new concrete parking slabs, ramps and sidewalks etc.... as indicated on drawings. Building Exterior/lnterior: (3 BR Unit converted to 2 BR H/C Unit): Demo/Remove designated components ofthe unit. Construct new stud and gyp board walls as shown on plans. Install new doors (interior and exterior) including new hardware. Remove existing and install new 5/8" gypsum board ceiling on existing trusses. Remove existing and install new flooring in entire unit. Install new base and crown moulding throughout entire unit. Install new frp at designated walls. Install new attic insulation. Paint interior of entire unit including but not limited to ceiling, walls, doors and trim, etc Install new h/c base and wall cabinets in kitchen and closetshelving including rods. Install new hvac system. Install new plumbing fixtures, fittings, faucets, etc. Install new electrical panel, all new wiring, devices, boxes, switches, etc... Install new light fixtures. Asbestos Abatement: The Asbestos Abatement Contractor shall be responsible for removal and disposal of the asbestos containing materials in all units and buildings where construction is to be performed. See Asbestos Specifications. Schedule of Major Work for Project MS 030-010A & 030-017 (Taylorsville, MS): All work listed below is for the (4) H/C Dwelling Units and Office/Maintenance Building: Sitework: Repair all areas ofsite damaged during construction including but not limited to ruts, concrete, etc.... Demo/Remove designated portion of existing sidewalks, parking pads, etc... and construct new as indicated. Construct new concrete parking slabs, ramps and sidewalks etc.... as indicated on drawings. Project 030-017 Office/Maintenance - Magnolia Circle: Building Exterior/Interior: Demo/remove designated components ofthe building including but not limited to walls, door frames, flooring, toilet fixtures, and toilet accessories, etc... Paint designated interior walls. Install new door and frame in designated openings. Relocate designated plumbing accessories as indicated. Install new plumbing fixtures, and accessories where indicated. Remove existing reception counter and pass-thru window and install new. Install new devices, boxes, switches, etc... Install new light fixtures. Project 030-017 Units 139 & 106 Magnolia Circle: Building Exterior/Interior: (4 BR Unit converted to 3 BR H/C Unit): Demo/remove designated components ofthe unit. Construct new stud and gyp board walls as shown on plans. Install new doors (interior & exterior) including new hardware. Remove existing and install new 5/8" gypsum board ceiling on existing trusses. Remove existing and install new flooring in entire unit. Install new base and crown moulding throughout entire unit. Install new frp at designated walls. Install new attic insulation. Paint interior of entire unit including but not limited to ceiling, walls, doors and trim, etc... Install newh/c base and wall cabinetsin kitchen, and closetshelving including rods. Install new hvac system. Install new plumbing fixtures, fittings, faucets, etc... Install new electrical panel, all new wiring, devices, boxes, switches, etc.... Install new light fixtures. Project 030-017 - Unit 302 Ford Drive: Building Exterior/Interior: (2 BR Unit converted to 1 BR H/C Unit): Demo/remove designated components ofthe unit. Construct new stud and gyp board walls as shown on plans. Install new doors (interior & exterior) including new hardware. Remove existing and install new 5/8" gypsum board ceiling on existing trusses. Remove existing and install new flooring in entire unit. Install new base and crown moulding throughout entire unit. Install new frp at designated walls. Install new attic insulation. Paint interior of entire unit including but not limited to ceiling, walls, doors and trim, etc... Install newh/c base and wall cabinets in kitchen, and closetshelving including rods. Install new hvac system. Install new plumbing fixtures, fittings, faucets, etc... Install new electrical panel, all new wiring, devices, boxes, switches, etc.... Install new light fixtures. Project 030-01 OA Unit 108 High St: Building Exterior/Interior: (3 BR Unit converted to 2 BR H/C Unit): Demo/remove designated components ofthe unit. Construct new stud and gyp board walls as shown on plans. Install new doors (interior & exterior) including new hardware. Remove existing and install new 5/8" gypsum board ceiling on existing trusses. Remove existing and install new flooring in entire unit. Install new base and crown moulding throughout entire unit. Install new frp at designated walls. Install new attic insulation. Paint interior of entire unit including but not limited to ceiling, walls, doors and trim, etc... Install new h/c base and wall cabinets in kitchen, and closet shelving including rods. Install new hvac system. Install new plumbing fixtures, fittings, faucets, etc... Install new electrical panel, all new wiring, devices, boxes, switches, etc.... Install new light fixtures. Asbestos Abatement: Schedule of Major Work for Project MS 030-019 (Bay Springs. MS): Sitework: Repair all areas ofsite damaged during construction including but not limited to ruts, concrete, etc.... Demo/Remove designated portion of existing sidewalks, parking pads, etc... and construct new as indicated. Construct new concrete parking slabs, ramps and sidewalks etc.... as indicated on drawings. Project 030-017 Office/Maintenance - Magnolia Circle: Building Exterior/Interior: Demo/remove designated components ofthe building including but not limited to walls, door frames, flooring, toilet fixtures, and toilet accessories, etc... Paint designated interior walls. Install new door and frame in designated openings. Relocate designated plumbing accessories as indicated. Install new plumbing fixtures, and accessories where indicated. Remove existing reception counter and pass-thru window and install new. Install new devices, boxes, switches, etc... Install new light fixtures. Project 030-017 Units 139 & 106 Magnolia Circle: Building Exterior/Interior: (4 BR Unit converted to 3 BR H/C Unit): Demo/remove designated components ofthe unit. Construct new stud and gyp board walls as shown on plans. Install new doors (interior & exterior) including new hardware. Remove existing and install new 5/8" gypsum board ceiling on existing trusses. Remove existing and install new flooring in entire unit. Install new base and crown moulding throughout entire unit. Install new frp at designated walls. Install new attic insulation. Paint interior of entire unit including but not limited to ceiling, walls, doors and trim, etc... Install newh/c base and wall cabinetsin kitchen, and closetshelving including rods. Install new hvac system. Install new plumbing fixtures, fittings, faucets, etc... Install new electrical panel, all new wiring, devices, boxes, switches, etc.... Install new light fixtures. Building Exterior/Interior: (4 BR Unit converted to 3 BR H/C Unit): Demo/Remove designated portion of existing sidewalks, parking pads, etc... and construct new as indicated. Construct new concrete parking slabs, ramps and sidewalks etc.... as indicated on drawings. Project 030-017 Office/Maintenance - Magnolia Circle: Building Exterior/Interior: Demo/remove designated components ofthe building including but not limited to walls, door frames, flooring, toilet fixtures, and toilet accessories, etc... Paint designated interior walls. Install new door and frame in designated openings. Relocate designated plumbing accessories as indicated. Install new plumbing fixtures, and accessories where indicated. Remove existing reception counter and pass-thru window and install new. Install new devices, boxes, switches, etc... Install new light fixtures. Project 030-017 Units 139 & 106 Magnolia Circle: Building Exterior/Interior: (4 BR Unit converted to 3 BR H/C Unit): Demo/remove designated components ofthe unit. Construct new stud and gyp board walls as shown on plans. Install new doors (interior & exterior) including new hardware. Remove existing and install new 5/8" gypsum board ceiling on existing trusses.

Bid Results

Multi-Residential

$1,517,000.00

Public - State/Provincial

Renovation

31

26

2

7

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
72
Bidding Soon
632
All Active Projects
302
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 13, 2024

August 12, 2024

March 10, 2025

img_map_placeholder

Multiple Locations, Newton, MS

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.