BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a transportation facility in Salt Lake City, Utah. Completed plans call for site work for a transportation facility.

Bid Security Amount Must Equal 5 Percent of the Total Amount of the Bid. A Pdf of the Bid Security Should Be Included in the Bid Documents. Bids Utilizing Cashier's Checks or Cash Equivalent May Not Be Submitted Electronically. Bid Security Will Be Returned to Each Unsuccessful Bidder After Tabulation and Award of the Construction Contract. SCOPE A. Furnish all labor, materials, equipment, and incidentals required to rehabilitate irrigation ditches as noted on the plans and as specified herein. Work shall include, but not be limited to ditch cleaning, clearing and grubbing, tree removal, herbicide application, reseeding and monitoring. B. Where indicated on the plans or as directed by the Engineer or SLCPU work may require removal of existing vegetation, recontouring side slopes, revegetation of impacted areas, placement of riprap, or herbicide application. C. Provide all necessary equipment, including safety equipment to effectively mow or remove the existing vegetation along ditch bank, and reseed with native species. D. At times, provide a certified herbicide applicator with invasive and noxious weed identification training to spot spray areas for invasive and/or noxious weed infestations. E. The Contractor shall provide a written report including photographs for each completed ditch segment. This report should include the general condition before and after preparation, the area of treatment in linear footage, methods used to rehabilitate the ditch, and what type and how much product was used. F. Maintain stormwater flows as specified in the contract documents. DESCRIPTION OF WORK A. The location of the work is: Along the Jordan & Salt Lake Canal, near Porter Rockwell Blvd. at 1300 West B. The work to be performed consists of furnishing and installing the equipment, facilities, services, and appurtenances indicated in the Contract Documents. The Work generally includes, but is not limited to, the following: Removal of the existing concrete lined channel and box culvert, temporary shoring of railroad embankment, installing a new concrete box culvert, precast modular block wall, and gravel access road.

Bid Results

Transportation Terminals

$4,936,103.00

Public - City

Site Work

20

14

6

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
35
Bidding Soon
545
All Active Projects
197
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2024

June 24, 2024

img_map_placeholder

To Be Determined, Salt Lake City, UT

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.