BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 7, 2026 at 7:00 PM

Updated January 8, 2026

Site work and paving for a bridge / tunnel in Vallejo, California. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Remove AC surfacing, HMA (Bridge) and crack treatment. 04-CC,Sol-80-13.8/14.1, 0.0/0.4 In Contra Costa and Solano Counties at Crockett and in Vallejo From Union Pacific Railroad Overhead to 0.8 Mile South of Route 80/29 Separation The Contractor Must Have Either a Class a License or the Following Class C License Which Constitutes a Majority of the Work: C-12 30 Working Days Submit your bid with bidder's security equal to at least 10 percent of the bid. CADOT - Remove AC Surfacing, HMA(Bridge) and Crack Treatment

Award

Bridges / Tunnels

$1,322,485.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2025

January 19, 2026

Project location map

I-80, Vallejo, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.