BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Libertyville, Illinois. Working plans call for site work for a road / highway.

As of 5/30/2024, no bids were received for this project. There are no plans to rebid the project at this time. City/County Lake County Division of Transportation The work includes removal of existing traffic signal equipment, maintenance of existing communication cabinet, installation of layer III network switches, fiber optical transceivers, power distribution units, and firewall appliances. Major items include 154 Each Fiber Optical Transceivers; 19 Each Layer III (Network) Switch; 16 Each Maintenance of Exiting Communications cabinet; 16 Each Remove Existing Traffic Signal Equipment; 21 Each Power Distribution Unit. Additional Information To bid on this project, contractors shall be required to provide a valid IDOT Certificate of Eligibility and obtain an approved LCDOT Authorization to Bid Project Location: various municipalities in Lake County, Illinois. The intersections are maintained by the Lake County Division of Transportation and the Illinois Department of Transportation. Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Removal of Existing Traffic Signal Equipment The work includes, the removal of existing traffic signal equipment, maintenance of existing traffic signal installation, installation of communication cabinets with layer III Network switches, fiber optical transceivers, power distribution unit and firewall appliance to traffic signal controllers and other related work. The work includes, but is not limited to, removal of existing traffic signal equipment, maintenance of existing traffic signal installation, the installation of layer III network switches, fiber optical transceivers, power distribution units, and firewall appliances to connect existing traffic signal controllers and expand the existing Lake County Division of Transportation ITS communication network. The work also includes all other incidental and collateral work necessary to complete the project as shown on the plans and described herein. Description: This work shall consist of furnishing and installing a Firewall used on the LCDOT Traffic Network. Description: This work shall consist of maintaining an existing communications cabinet that has been designated to remain in operation on Lake County's PASSAGE Network during construction. The project includes work on several IDOT maintained traffic signals listed above. The Contractor shall not be required to take maintenance of these IDOT maintained signals. The Contractor shall be responsible for any damage to the traffic signal equipment while working at the intersection according to the IDOT D1 special provision for MAINTENANCE OF EXISTING TRAFFIC SIGNAL INSTALLATION included herein.

Final Planning

Roads / Highways

$400,000.00

Public - County

Site Work

7

5

2

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
393
Active Projects
191
Bidding Soon
3,833
All Active Projects
1,544
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 14, 2024

August 12, 2024

December 30, 2024

img_map_placeholder

Multiple Locations, Libertyville, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.