EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 3, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Tonica, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

City/County LaSalle Construct 4,512 Ton Hma Sc Il-9.5, Mix "C", N50; 1,124 Sq. Yd. Hma Surf. Rem., Variable Depth; 262 Sq. Yd. Hma Rem.-butt Jt.; 24,074 Pound Bit. Matl. (Tack Coat); 98 Pound Bit Matl. (Prime Coat); 19,198 Ft. Long Joint Sealant; 51,319 Sq. Yd. Hma Surf. Rem., 3/4"; 587 Sq. Yd. Hma Surf. Rem. 1 1/4"; 1,094 Ton Agg. Shldrs., Ty B; 15,066 Ft. Short-term Pavt. Mking; 17,484 Ft. Paint Pavt. Mk-line 4"; 37,926 Ft. Paint Pavt. Mk-line 6"; 75 Ft. Paint Pavt. Mk-line 8"; 49 Ft. Pref. Pl Pavt. Mk, Ty B-inl.-line 24"and Other Misc. Work Project Location: County Highway 14 - From Il Route 251 to County Highway 44 Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Construct 1,128 Ton HMA SC

Award

Roads / Highways

$618,361.00

Public - County

Paving, Site Work

12

6

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
104
Bidding Soon
2,075
All Active Projects
876
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2024

June 14, 2024

img_map_placeholder

Co Hwy 14, Tonica, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Construct 1,128 Ton HMA SC

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.