BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Lakeland, Tennessee. Contact the soliciting agency for additional information.

Purpose The purpose of this project is to evaluate the Scotts Creek Wastewater Treatment Plant by performing a condition and capacity assessment, evaluating the capacity of the existing facility to meet future demand and make recommendations for improvements to the facility or unit processes. Scope of Services The Scotts Creek Wastewater Treatment Plant utilizes a SBR (sequencing batch reactors) activated sludge system for wastewater treatment. The plant's current capacity is 2.2 MGD, although the plant is permitted for full build out, 4.5MGD. The treated effluent is discharged into the Loosahatchie River. The evaluation will consist of two components, a capacity assessment, and a condition assessment. Capacity Assessment By 2026, the City will be redirecting wastewater flow currently flowing to the City of Memphis Fletcher Creek Interceptor to the Scotts Creek WWTP via the new Oliver Creek Interceptor. The current average daily flow is approximately 0.60 MGD per day. With the additional flow it is estimated the average daily flow will increase to approximately 1.5MGD. The plant has the capacity to treat the additional dry weather flow, however during large rain events it is expected the flow will exceed the capacity of the plant. The capacity assessment will be used to identify and prioritize the need for expansion of the facility or individual processes. The Consultant will provide recommendations for managing the excess wet weather flows and options for phasing in a plant expansion. Condition Assessment The Scotts Creek Wastewater Treatment Plant was constructed in 2007. Most of the equipment is original to the facility. The condition assessment will include an assessment of each treatment process, process mechanical components, and overall performance and operation of the system. The Consultant will provide individual inspection reports and a summary of the data collected including condition ratings, replacement schedule, recommendations, and budgetary cost estimates. Questions regarding the RFQ should be directed to: Paul Posey Staff Engineer (901) 867-5401 pposey@lakelandtn.org

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
34
Bidding Soon
437
All Active Projects
191
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.