BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Klamath Falls, Oregon. Completed plans call for site work for a water / sewer project.

Wastewater Treatment Plant Improvements. Located at 2980 Maywood Dr, Klamath Falls, or 97603. Construction Phase Services to Include Potential Early Construction Packages, Early Equipment Procurement, and Complete Construction Phase Services Including Commissioning and Project Closeout. Scope of Treatment Facilities Includes: Pump Station(S) and Yard Piping New Treatment Processes Including: Replacement Headworks Screen, Suspended Air Flotation; Moving Bed Biofilm Reactor (Mbbr) and Associated Blower Building; Effluent Filtration, Chemical Storage and Feed Facilities, Disinfection, Standby Power, Scada Facilities and Related Improvements. The Cmgc Contract Will Include the Following Services and Work: Services During the Design Phase to Assist With Constructability Reviews, Project Cost Estimating and Identification of Value Engineering Ideas. Cost Factors, 10 Total Points, 100 Proposal Documents Details Regarding the Selection Criteria and the Selection Process Are Included in the Request for Qualifications. Refer to the Proposal Documents for All Further Requirements Regarding Statements of Qualifications, Proposals, Cmgc Selection, and Other Proposal Submittals, Qualifications, and Procedures. Attendance at the Information Conference is Required in Order to Submit an Soq. One-step Qualifications-based Selection Process Cmgc Will Be Selected on the Basis of Qualifications and a Limited Number of Cost Factors. Owner Will Receive Statements of Qualification and Evaluate These, Along With Other Information, to Select the Most Highly Qualified Proposer. The Cmgc Contract Has an Expected Start Date August 1, 2024 and Duration for Construction of 780 Days. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Owner Anticipates That the Cmgc's Contract Price Will Be Approximately $35,000,000 to 45,000,000. Question Deadline 05/28/2024 Submit questions about the meaning or intent of the Proposal Documents, Addenda, and the related supplemental data to Brady Fuller/Jacobs at Brady.Fuller@jacobs.com. All inquiries must be received no later than 7 days prior to the date for submittal of SOQs

Post-Bid

Water / Sewer

$45,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
2
Bidding Soon
61
All Active Projects
18
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2024

August 1, 2024

img_map_placeholder

2980 Maywood Dr, Klamath Falls, OR


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.