BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 5, 2024 at 8:00 PM

Updated July 6, 2024

Site work for a civil project in Brigham City, Utah. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

County: Box Elder This is a P+t (Price + Time) Project. The Department Will Not Hold Retention on This Project. Per Utah State Code as 13-8-5 (1) Prime Contractors Cannot Hold Retention. Refer to Utah Code as 13-8-5 (1) for More Information. Wage Rates: N/A The Principal Items of Work Are as Follows (for All Items of Work See Attachment): Drainage Pipe Liner, 24 Inch Traffic Control Circular Steel Safety End Section 24 Inch, 10:1 Slope, Crossing Engineer's Estimate: Less Than or Equal $500k UTDOT - Culvert Repairs Along State Roads in R1 Drainage

Award

Bridges / Tunnels

$496,830.00

Public - State/Provincial

Site Work

18

5

7

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
68
Bidding Soon
808
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2024

June 24, 2024

Project location map

Multiple Locations, Brigham City, UT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.