BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Munising, Michigan. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Bid is Cancelled . The contractor shall provide all labor, materials, supervision, and all other incidentals to repave the parking lot at the Munising Work Center in accordance with all contract terms, conditions, attachments, and specifications. MAGNITUDE OF CONSTRUCTION PROJECT : The estimated magnitude of this construction project is between $25,000 and $100,000. Period of Performance: 07/01/2024 to 10/04/2024 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. No pre-quote meetings are scheduled for this project. Please contact Cameron Edwards (cameron.edwards@usda.gov) for site related questions. 1 Scope In accordance with the terms and conditions of the Contract, the Contractor shall perform the work of this Statement of Work (SOW) for the USDA-Forest Service (FS) as described below. The Contractor shall perform inspection, and construction services in accordance with the requirements within the contract. FS will provide construction staking. The Contractor shall provide all equipment, labor, supervision, transportation, materials, tools and other incidentals and execute all work necessary to perform the milling and overlay of the Munising Work Center in accordance with specification and exhibits in this contract, and current industry standards. Contractor is responsible for ensuring all equipment meets State, Federal, and Local Laws. The Contractor shall perform all services necessary to produce a complete and usable project in accordance with the project goals and design intent stated herein. 1.2 Location The project is located at the Hiawatha National Forest Munising District Work Center at 314 E Varnum St. From the Munising District Office turn left onto E. Munising Ave., at the traffic circle take the 2nd exit onto Cedar Street, travel 0.2 miles along Cedar Street, continue Cedar Street for 0.2 miles to East Varnum Street, turn right onto East Varnum Street, travel on Varnum street for 250 feet to reach 314 East Varnum Street Munising, MI 49862. Coordinates:46.40

Final Planning

Sidewalks / Parking Lot

$100,000.00

Public - Federal

Paving, Site Work

3

7

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
1
Bidding Soon
31
All Active Projects
8
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2024

December 26, 2024

img_map_placeholder

314 E Varnum St, Munising, MI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.