Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Crystal River, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Citrus County, Florida (County) invites interested parties to submit a Bid to provide roadway full depth reclamation (FDR) and resurfacing work for two lanes of N. Dunkenfield Ave from W. Venable St. to 250 Linear feet North. of N. Marion Way, approximately 1.9 miles per lane. Successful Bidder shall furnish all labor, material, consumables, tools and appropriate equipment necessary to perform all operations for FDR, resurfacing, and all other work noted in the plans. Any person requiring reasonable accommodation at this meeting because of a disability or physical impairment should contact Citrus County, 3600 W. Sovereign Path, Lecanto, FL 34461, ADA Coordinator (352) 527-5477, at least two days before the meeting. The work shall consist of the production of a stabilized base course composed of a pulverized and blended mixture of the existing bituminous concrete pavement, the entire existing base course and any supplemental base material that is added for strength or road widening. Stabilization of the reclaimed materials shall be accomplished by injecting Emulsion and spreading Portland cement with the reclaimed materials to for a stabilized base course in accordance with these specifications. The finished product shall consist of 8" stabilized base and 2" of Type FC 12.5 Asphalt (76-22 modified polymer). All materials including cement, asphalt, and supplemental base material, shall comply with these specifications. The ultimate roadway section shall consist of two 11' travel lanes. Additionally, there will be a 30-day road closure for the excavation of unsuitable material and replacement of suitable sub-grade and base material (approximately 665 feet in length and the full width of the roadway). Asphalt to be provided for the project must be identified on the current FDOT Asphalt Mix Design Plant Assignment Sheet and is to be submitted with the Bid. Pavement Markings are to meet the current MUTCD criteria. The project includes pavement reconstruction of Dunkenfield Ave from W Venable St to N Marion Way. From W Venable St to north of W Snow Ct. (STA 10+50 to STA 85+70) the existing pavement shall be reconstructed using Full Depth Reclamation topped with an asphalt pavement overlay. From north of W Snow Ct. to south of W Cottage Ln (STA 85+70 to STA 94+15) the existing pavement shall be fully reconstructed including removal of unsuitable material below the roadway, placement of new roadway embankment, and roadway reconstruction using Type B Stabilized Subgrade, Limerock Base, and Asphalt Pavement. From south of W Cottage Ln to N Marion Way (STA 94+15 to STA 109+91.47) the existing pavement shall be reconstructed using Full Depth Reclamation topped with an asphalt pavement overlay. Other work includes milling and asphalt resurfacing at pavement connection points, temporary and permanent pavement markings, shoulder grading (Contractor is responsible for providing positive drainage away from the roadway surface), sodding, erosion and sediment control and maintenance of traffic. Deadline for Questions May 30, 2024 4:00 PM
Bid Results
Roads / Highways
$2,342,471.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 11, 2024
August 12, 2024
N Dunkenfield Ave, Crystal River, FL
Related To This Project
Crystal River, FL
--
Crystal River, FL
--
Crystal River, FL
Bid Date: Jun 26 2024
Crystal River, FL
Bid Date: Jul 17 2024
Crystal River, FL
Bid Date: Jul 15 2024
Crystal River, FL
Bid Date: Aug 07 2024
Crystal River, FL
Bid Date: Aug 14 2024
Crystal River, FL
Bid Date: Aug 05 2024
Crystal River, FL
--
Crystal River, FL
Bid Date: May 16 2024
Crystal River, FL
Bid Date: Apr 17 2024
Crystal River, FL
--
Crystal River, FL
Bid Date: Aug 05 2019
Crystal River, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.