BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Gulfport, Mississippi. Completed plans call for the renovation of a military facility.

Rebuild backflow preventer - USCG Station Gulfport, MS This is a combined synopsis / solicitation to rebuild the backflow preventer located near the pier at US Coast Guard Station Gulfport, MS. A Firm Fixed Price Construction order will be issued to the contractor with the lowest priced quote. A. Contractor will rebuild backflow preventer located near the pier at Station Gulfport with a Watts 2 1 2" 909 Rebuild Kit or comparable. B. Replace two 2 Vi inch gate valves. C. Contractor will dispose of all materials related to repair offsite. D. Contractor will ensure system is in fully operational status upon completion of repairs by conducting a domestic backflow test. E. Contractor shall submit required documents to the Department of Public Works located at 4050 Hewes Ave, Gulfport, MS 39507. Phone: 228-861-3601. Place of performance is USCG Station Gulfport 991 23rd Avenue Gulfport, MS 39501 Period of performance is June 17th through 21st, 2024. Period of performance is negotiable. Federal Acquisition Regulations and Department of Labor wage determination MS20240050 are attached and are applicable. Payment and performance bonds are not required. Commence work under this contract within 5 calendar days after the date the Contractor receives the notice to proceed. (b) Prosecute the work diligently, and (c) Complete the entire work ready for use not later than 30 calendar days after the date the contractor receives the notice to proceed (if industry standards allow) POINT OF CONTACT The Government Point ofContact (POC) for this work is CWO-4 Petrik, ((251) 441- 5041, James.M.Petrik@uscg.mil. Onsite support/supervisor is MKC Shelton Franklin, (228)382-7615, Shelton.k.franklin@uscg.mil. All work shall be coordinated through the onsite support/supervisor to minimize operational impacts to the unit during the execution ofthe work.

Post-Bid

Military

$25,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
29
Bidding Soon
457
All Active Projects
218
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 31, 2024

June 17, 2024

img_map_placeholder

991 23rd Ave, Gulfport, MS


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.