BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 11, 2024 at 8:00 PM

Updated October 1, 2025

Site work, paving and new construction of a mixed-use development in Mount Sterling, Kentucky. Completed plans call for the construction of a transportation facility; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Each sealed proposal shall be accompanied by a certified check, cashier's check, or satisfactory bid bond, in a sum that is not less than five (5) percent of the aggregate amount of bid, payable to the Mount Sterling - Montgomery County Airport Board. The successful bidder will be required to execute Contract and to provide Contract Surety in an amount equal to one hundred (100) percent of the bid amount for performance, and a bond in the amount equal Questions may be directed to Jake Dahl, PE, Plane & Simple Engineering, PSC at jake@planeandsimple.us or (859) 227-5907. Answers to all questions that are not provided in the contract plans and specifications will be issued to all plan holders via an addendum, as deemed necessary for clarifications that affect fair bidding procedures. questions are due by 5:00 PM on May 17, 2024. Loca@on: Mount Sterling-Montgomery County Airport (IOB) in Mt. Sterling, Montgomery County, Kentucky. The specific project loca@on is 380 03' 27.11" N, 830 58' 55.99" W, on the west area of the airport and the new building will be adjacent to the exis@ng Terminal. Descrip@on: The project will include demoli@on of an exis@ng asphalt parking lot, rerou@ng of water service, electrical service, and internet/cable service, installing a new sep@c tank and leaching chamber line, construc@ng the building, paving a 12-space asphalt parking lot, and installing various site concrete to @e-in with exis@ng infrastructure. The new building will be a two-story ~8,000 square feet structure with a dedicated pilots lounge and restroom, open terminal lounge and recep@on, cer@fied tes@ng center, a sleeping room, kitchen, conference room, offices, and public restrooms. This project does not involve any structure demoli@on.

Award

Transportation Terminals

$3,777,777.00

Public - County

New Construction, Paving, Site Work

126

22

5

Subscribe For Documents

64 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
105
Bidding Soon
1,257
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2024

July 22, 2024

Project location map

709 Airport Rd, Mount Sterling, KY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.