BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 24, 2024 at 8:00 PM

Updated July 25, 2024

Site work for a water / sewer project in West Palm Beach, Florida. Completed plans call for site work for a water / sewer project.

As of June 24, 2024, this project has not yet been awarded. The project is expected to be awarded on October 22, 2024. The Bids Will Be for Furnishing All Materials, Labor, Supervision, Equipment, Supplies, Fees, Expertise, and Services Necessary to the Bids Will Be for Furnishing All Materials, Labor, Supervision, Equipment, Supplies, Fees, Expertise, and Services Necessary for the Replacement, Removal or Abandonment of Old and Substandard Potable Water Main Pipes and Water Services With Approximately 12,000 Linear Feet of New Pipes and the Relocation of Approximately 112 Existing Water Services From the Back to the Front of the Properties as Well as Associated Appurtenances Including Site Restoration of Affected Areas. These Improvements Are Necessary as Part of the Continued Restoration and Repair of Water Infrastructure in the Glades Region and Will Improve Water Quality to Residents and Business. NTP: November 21, 2024 o Substantial Completion: January 15, 2026 (420 days from NTP) o Final Completion: February 14, 2026 (450 from NTP) Engineer's cost estimate is $6,121,452.37. Q/A - Questions May Be Addressed in Writing to Henry Melendez, P.e. At Hmelendez@pbcwater.com or Palm Beach County Water Utilities Department, 8100 Forest Hill Blvd., West Palm Beach, Fl 33413. To receive consideration, such questions shall be submitted in writing to the Engineer no less than ten (10) calendar days (May 26, 2024) * The deadline for Contractor questions changed from May 26, 2024 at 11:59 PM to June 8, 2024 at 11:59 PM. The Sbe Subcontracting Goal for This Project is a Mandatory Minimum of 20% Participation, See Ebo Ordinance Section 2-80.27(1)(C), of Which 5% Shall Be Among Certified African American and/or Hispanic American Owned Firms; See Ebo Ordinance Section 2-80.27(2)(B). Bid Proposals Must Be Submitted on the Forms Provided by Palm Beach County and Accompanied by a Bid Bond Security in Favor of Palm Beach County in the Amount of Not Less Than Five Percent (5%) of the Bid Price. A Public Construction Bond (100%) Will Be Required of the Successful Bidder Within Fourteen Calendar Days of Notification From County. The Board of County Commissioners Reserves the Right to Waive Any Bid Irregularities, Informalities, or Technical Deficiencies and to Reject Any and All Bids.

Award

Water / Sewer

$6,250,207.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

22

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
284
Active Projects
117
Bidding Soon
1,878
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2024

November 21, 2024

Project location map

Multiple Locations, West Palm Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.