BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in New Athens, Illinois. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

This report presents the results of a subsurface exploration and geotechnical evaluation for the proposed new boat ramp and parking lot to be constructed adjacent to Goose Lake to the east of New Athens, Illinois. The purpose of this study was to determine and evaluate the subsurface conditions existing at the subject site and provide soil parameters for use by the design engineers. Included herein are the results of the subsurface exploration, field and laboratory soil test data, and recommendations regarding design and construction of the earth retaining system. The work included in this project is as follows: the construction of a new boat ramp, dock, sidewalks, parking lot, precast vault toilet, steel sheet pile wall, kayak launch and related features. Bidders must be prequalified with CDB; allow 45 days for application processing. For an application and a copy of CDB's Standard Documents for Construction (applicable to this project), visit CDB's Website electronically or phone 217/782-6152 (TDD 217/524-4449). EXISTING CONDITIONS: The Peabody-River King State Fish and Wildlife Area is located east of New Athens in St. Clair County. It is accessed via Old Highway 13 and Darmstadt Road, east from New Athens. Some 1,800 acres of the 2,000 acre Peabody-River King State Fish and Wildlife Area were donated to the Illinois Department of Natural Resources by the Peabody Coal Co. in 1994. The Peabody Coal Co. had mined the area from the late 1950s through the late 1980s, operating its surface mines under a series of mine reclamation measures. As a result, the area contains a varied topography, including more than 20 lakes and ponds totaling 534 acres. The water impoundments are a result of the surface mining operations. With abundant largemouth bass, bluegill, crappie and catfish, Peabody-River King’s many lakes and ponds provide excellent fishing opportunities to thousands of anglers annually. Boating and fishing regulations vary with the size of the water body being fished. Larger lakes more than 60 acres in size have a 10-horsepower limit and a “no-wake” rule. On smaller lakes, either trolling motors or bank fishing only is permitted.

Bid Results

Sidewalks / Parking Lot

$527,500.00

Public - State/Provincial

Paving, Site Work

14

18

4

4

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
211
Active Projects
120
Bidding Soon
1,378
All Active Projects
637
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 11, 2024

July 11, 2024

November 23, 2024

img_map_placeholder

Nuernberger Rd, New Athens, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.