Site work for a water / sewer project in Havre, Montana. Completed plans call for site work for a water / sewer project.

Rocky Boy's/NCMRWS Segment E3 Service to Hill CWD & Segment E6-B: Facility Only Est. Completion Date: Dec. 5, 2025 CONTRACT #2 - FACILITIES CONSTRUCTION: Construction of Facilities consisting of the following approximate quantities: 1 booster pump station buildings complete with pipes, pumps, and all mechanical and electrical; 1 meter building including piping and valving, all associated site piping and appurtenances; flushing and testing; signage; gravel; site work; and seeding. Bidder and any of the Bidder's Subcontractors will be required to obtain registration with the Montana Department of Labor and Industry (DLI) prior to bidding on this project, and must have registered prior to execution of the Construction Agreement. Forms for registration are available from the DLI, PO Box 8011, 1805 Prospect, Helena, MT 59604-8011. Information on registration can be obtained by calling (406) 444-7734. All laborers and mechanics employed by Bidder or its subcontractors in performance of the Work shall be paid wages at rates as may be required by the laws of Hill County and the State of Montana. The Bidder must be an Equal Opportunity Employer and ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, or national origin. All Bids shall be prepared according to the Instruction to Bidders contained within the Project Manual. Each Bid shall be accompanied by a separate envelope containing a Bid Security in the form of a Bidder's Bond executed by the Bidder as principal and by a surety company authorized to do business in the State of Montana, payable to North Central Montana Regional Water Authority, in a sum equal to ten percent (10%) of the full amount of the Bid. This is to serve as a guarantee that the successful Bidder will enter into a Contract within fifteen (15) days of Notice of Award, in accordance with the terms of the principal's Bid and Contractor's Bond as required by law and regulations and determinations of the governing board for the performances of such Work. Only Bids that are accompanied by such a Bond will be considered. Successful Bidders shall furnish an approved Performance Bond and a Labor and Materials Payment Bond, each in the amount of one-hundred percent (100%) of the contract amount. Insurance as required shall be provided by the successful Bidders and certificate(s) of that insurance shall be provided. Federal Regulations: The project is funded in part by the Bureau of Reclamation and the State of Montana Treasure State Endowment Program - Regional Water System funds and/or the Drinking Water Revolving Fund Loan Program. Award of the project will be contingent upon the receipt of funding and award concurrence from these entities. Bidders on this Work will be required to comply with Title 41 CFR Part 60-4, 40 CFR-35.3145(d), and President's Executive Orders 11246 and 12549. The requirements for Bidders and Contractors under these Regulations and Executive Orders concern utilization of Minority Business Enterprises (MBE), Women Business Enterprises (WBE), and Small Businesses (SBE), and are explained in the Specifications. MBE/WBE Subcontractor Solicitation Information shall be enclosed in the required Bid Bond envelope. Failure to include the form in the Bid Bond Envelope will result in the Bid not being opened. All Bids must be submitted on the Bid Form furnished by the Engineer. No bid may be withdrawn after the scheduled time for the public opening of bids. No Bid will be read or considered that does not fully comply with the above provisions and other provisions contained within the Bidding Documents, and any deficient Bid submitted will be returned to the Bidder unopened. All Bids will be made on the basis of cash payment for such work. The Owner reserves the right to reject any or all Bids, and further reserves the right to award the Contract in the best interests of the Owner. The Owner reserves the right to hold the three (3) low Bids for a period of sixty (60) days after the date of the Bid opening. The work for each contract must be completed no later than the following: a) Substantial Completion - Oct 31st, 2025; and b) Final Completion - Dec 5th, 2025. Question Deadline 05/27/2024 All questions about the meaning or intent of the Bidding Document are to be submitted to ENGINEER in writing. Questions received less than ten (10) days prior to the date for opening of Bids may not be answered.

Bid Results

Water / Sewer

$6,406,059.00

Public - State/Provincial

Site Work

114

31

8

8

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
2
Bidding Soon
12
All Active Projects
5
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2024

July 4, 2024

img_map_placeholder

Multiple Locations, Havre, MT

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.