Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 4, 2025 at 7:00 PM
Updated November 5, 2025
Site work and new construction of a fire / police facility in Tampa, Florida. Working plans call for the construction of a 11,000-square-foot, one-story above grade fire / police facility; and for site work for a fire / police facility.
Scope details have not been released. As of October 28, 2025 the project is in design stage. Information regarding subcontractor opportunities has not been disclosed. Construction is expected to begin in March 2026.* *The closed solicitation has been included below for reference: _______________________________________________________________________________ The City of Tampa seeks Professional Design-Build services for the design, development, and construction of a new one-two story "Fire Station No. 24" and campus upon an existing 3.05-acre site (approximately) owned by the City Of Tampa at 4902 East Whiteway Drive, Tampa, Florida 33617. The site also consists of two parcels and a public right of way (Refer to Design Criteria Package.). All construction and improvements for this project shall be prioritized through a collaborative programming and design process culminating in a GMP Proposal for the outlined site, building(s), structures, and amenities. Additional information regarding specific design, construction, and improvements are illustrated in the Design Criteria Package. well as construction ($15,959,000). Questions may be directed to Jim Greiner, P.E., Contract Administration, City of Tampa, (813) 274-8598, or E-Mail jim.greiner@tampagov.net. Total Project Estimate $250,000. Questions may be directed to Jim Greiner, P.E., Contract Administration, City of Tampa, (813) 274-8598, or E-Mail jim.greiner@tampagov.net. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Pre-Construction/Negotiated
Fire / Police
$15,959,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 3, 2024
March 10, 2026
4902 E Whiteway Dr, Tampa, FL
Related To This Project
Tampa, FL
--
Tampa, FL
Bid Date: Jun 11 2024
Tampa, FL
Bid Date: May 14 2024
Tampa, FL
Bid Date: Jul 31 2024
Tampa, FL
Bid Date: Jun 07 2024
Tampa, FL
Bid Date: Jun 11 2024
Tampa, FL
--
Tampa, FL
--
Tampa, FL
Bid Date: May 30 2024
Tampa, FL
Bid Date: May 31 2024
Tampa, FL
Bid Date: Aug 20 2020
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
