BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 24, 2024 at 8:00 PM

Updated May 22, 2025

Site work for a playground / park / athletic field in West Bloomfield, Michigan. Completed plans call for site work for a playground / park / athletic field.

https://westbloomfieldtwpmi.documents-on-demand.com/l=190a3472b68045e082a7abfe2cee8713&r=CCD1968EC49C0ABCC7F54A975F4553EC&d=444f182f0625ef11a407000c29a59557 Drake Sports Park Playground (PSP24-0014) Request for approval for site plan amendment for the development of a new playground facility along with concrete pad, drainage system and new sidewalks for Drake Sports Park. Location: 6801 Drake Road; located on the east side of Drake between Maple Road and 14 Mile Road; Sidwell #s 18-33-101-012 and -016; 35 acres Zoning: REC Recreation District Applicant: Brian Bachler, DLZ Michigan on behalf of West Bloomfield Parks and Recreation ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Drake Sports Detention Basin Remediation Reference Number 0000351557 Job Location 6801 Drake Road West Bloomfield MI, 48323 This project consists of the excavation and removal of accumulated sediment, re-grading of detention basin side slopes and restoration of the original stormwater management volumes for two (2) existing sediment / detention basins; along with two (2) existing outlet control / swale structures. Miscellaneous inlet / outlet piping and associated end sections, overflow structures, and sediment filters will be replaced / rehabilitated as part of the proposed improvements. The contractor will be responsible for providing their own means of access to the work areas (including any required permits), along with the "in kind" restoration of all disturbed areas. Soil erosion measures, and temporary construction / tree protection fencing, will be required as shown on the Drawings. Question Deadline 05/28/2024 at 2:00 PM ET Questions are submitted online No All Work Shall Be in Accordance With the Bidding Documents Prepared by the Engineer. Each Sealed Proposal Shall Be Marked "west Bloomfield Parks & Recreation Commision - Drake Sports Park - Detention Basin Remediation" West Bloomfield Parks & Recreation Commission reserves the right to reject any or all bids, modify quantities, negotiate with one or more bidders and to waive any irregularities in bidding, and to make the award as may appear to be in the best interest of West Bloomfield Parks & Recreation Commission. No Bid may be withdrawn after the scheduled closing time for receiving bids for at least one hundred and twenty (120) calendar days.

Post-Bid

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - City

Site Work

7

11

13

4

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
356
Active Projects
216
Bidding Soon
2,517
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2024

July 1, 2024

Project location map

6801 Drake Rd, West Bloomfield, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.