BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Georgetown, Tennessee. Contact the soliciting agency for additional information.

The purpose of this Project is to complete the cleaning, maintenance, reconditioning, and inspection services for the Mountain Lake 500,000-gallon steel elevated water storage tank in the Savannah Valley Utility District water system. The initial contract period is (1) year. The contract may be renewed annually for a maximum of nine (9) renewals. Bids for the entire ten (10) year scope of work will be accepted at this time. All Bidders must be licensed contractors as required by the Tennessee Code Annotated Title 62 Chapter 6 regarding contractor licensing. Bidder's name, license number, license limits, classification and expiration date, must be placed on the outside of envelope containing the bid documents. For bid work which includes Subcontractor(s) for electrical, plumbing, or HVAC work, the Subcontractor(s) shall be listed on the envelope if the subcontract portion is less than $25,000. If the subcontract is $25,000 or greater, the Subcontractor(s)' license information shall also be on the envelope. Additionally, if bid work includes Subcontractor(s) for masonry work, the Subcontractor(s) shall be listed on the State Contractor Licensing Information form with the phrase "less than $100,000" if the subcontract portion is less than one hundred thousand dollars ($100,000.00) including materials and labor. If the subcontract is one hundred thousand dollars ($100,000.00) or greater, the Subcontractor(s)' license information shall also be completed on the form. Bond Notes: A Bid Bond shall accompany all Bids in the amount of five percent (5%) of the Bid The information concerning the Bidder and all, if any, Subcontractors shall be provided using the State Contractor Licensing Information form, Section 00411, and attached to the outside of envelope containing the Bid. Owner Rights:The Savannah Valley Utility District reserves the right, as its interest may require, to reject any and/or all Bids and to waive informalities herein. No Bid may be withdrawn for a period of sixty (60) days after the scheduled time for closing the receipt of Bids.

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
24
Bidding Soon
630
All Active Projects
281
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2024

July 1, 2024

img_map_placeholder

Multiple Locations, Georgetown, TN

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.