Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published June 14, 2024 at 8:00 PM
Updated June 15, 2024
This is a service / maintenance or supply contract in Cupertino, California. Contact the soliciting agency for additional information.
Location and Description. The Project location includes a number of sites: McClellan Road and Homestead Road over Stevens Creek. Stevens Creek Boulevard, Vallco Parkway, Miller Avenue, and Tantau Road over Calabazas Creek. The project scope is described as follows: Perform maintenance repairs to include methacrylate deck treatment, removal and patching of unsound/spalled concrete, concrete crack repair (epoxy injection), reinforcement repair, expansion joint cleaning and resealing, cold planing/removal and installation of asphalt, deck sealing, cleaning and painting of structural steel, removal and installation of roadway striping and pavement markers, and associated work. Perform maintenance repairs to include methacrylate deck treatment, removal and patching of unsound/spalled concrete, concrete crack repair (epoxy injection), reinforcement repair, expansion joint cleaning and resealing, cold planing/removal and installation of asphalt, deck sealing, cleaning and painting of structural steel, removal and installation of roadway striping and pavement markers, and associated work. Estimated Cost. The estimated construction cost for the base bid items is $975,000. Time for Final Completion. The Project must be fully completed within 115 calendar days from the start date set forth in the Notice to Proceed (Base Items only). Seven calendar days will be added if Bid Alternative 1 is included in the Work. 14 calendar days will be added if Bid Alternative 2 is included in the Work. City anticipates that the Work will begin on or about TBD, but the anticipated start date is provided solely for convenience and is neither certain nor binding. Each bid must be guaranteed by bid security of ten percent of the maximum bid amount, in the form of a cashier's or certified check made payable to the City, or bid bond using the form included in the Contract Documents and executed by a surety licensed to do business in the State of California. Performance and Payment Bonds. The successful bidder will be required to provide performance and payment bonds, each for 100% of the Contract Price, as further specified in the Contract Documents.
Post-Bid
Bridges / Tunnels
$975,000.00
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
1
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 11, 2024
July 11, 2024
Multiple Locations, Cupertino, CA
Related To This Project
Cupertino, CA
Bid Date: Jun 04 2024
Cupertino, CA
Bid Date: Jul 03 2024
Cupertino, CA
Bid Date: Jul 03 2024
Cupertino, CA
--
Cupertino, CA
Bid Date: Jul 25 2024
Cupertino, CA
Bid Date: Jul 25 2024
Cupertino, CA
Bid Date: Feb 17 2026
Cupertino, CA
Bid Date: Jul 30 2024
Cupertino, CA
--
Cupertino, CA
Bid Date: May 10 2024
Cupertino, CA
Bid Date: May 08 2024
Cupertino, CA
Bid Date: Apr 23 2024
Cupertino, CA
Bid Date: Apr 16 2024
Cupertino, CA
Bid Date: Apr 16 2024
Cupertino, CA
Bid Date: Mar 12 2024
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed