Published May 23, 2024 at 8:00 PM

Updated May 24, 2024

Site work, paving and outdoor lighting for a mixed-use development in Cedar Rapids, Iowa. Completed plans call for site work for a transportation facility; for paving for a transportation facility; for outdoor lighting for a transportation facility; and water / sewer project.

The work generally consists of constructing a new taxiway and taxilane. Improvements include approximately 11,850 square yards of 8"-15.5" Portland Cement Concrete pavement, 19,750 square yards subgrade preparation, 19,750 square yards aggregate base course, 74,100 cubic yards of excavation, 18,250 cubic yards of topsoil. Other improvements include 11,600 square yards of cement treated permeable base course, 3,300 linear feet of subdrain installation, 3,100 linear feet of 15"-66" storm sewer, airfield pavement markings, airfield lighting, seeding, fertilizing, and mulching, erosion control, and traffic control. Prospective bidders are hereby advised that the quantities indicated herein are approximate and are subject to change per Section 40 of the General Provisions. The Cedar Rapids Airport Commission anticipates a Notice-to-Proceed, that is dependent on establishment of Federal Funding assistance and submittal and approval of the properly executed contract documents, to be issued October 7, 2024 and has established the following completion requirements: Phase 1: Complete by May 2, 2025 Phase 2: Early Start Date of 60 Calendar Days following Phase 1 completion; Phase 3: Complete within 60 Calendar Days Project Complete by October 1, 2025. Bid security in the amount of Five percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. The successful bidder shall be required to provide Performance and Payment Bonds, each in the amount of 100 percent of the Contract Price. Bid security and other bonds shall be provided on forms furnished by the Owner. Goals for minority participation for each trade: 1.7% Goals for female participation in each trade: 6.9% The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of this DOT-assisted contracts. In accordance with 49 CFR Part 26.45, the sponsor has established a contract goal of 4.94 percent participation for small business concerns owned and controlled by certified socially and economically disadvantaged enterprise (DBE). The bidder shall make and document good faith efforts, as defined in Appendix A of 49 CFR Part 26, to meet this established goal. The Contractor is required to comply with wage and labor provisions and to pay minimum wages in accordance with the current schedule of wage rates established by the United States Department of Labor. The right is reserved, as the Cedar Rapids Airport Commission may require, to reject any and all bids, to waive any informality in the bids received, and to re-advertise. All questions must be received no later than 12:00 PM local time, May 17, 2024. Questions received after this date may not be answered. All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing, either through mail or fax. Contact individual shall be as follows: Eric Scott Foth Infrastructure & Environment, LLC, 411 6th Avenue SE, Suite 400, Cedar Rapids, IA 52401 319.365.9565 (Phone) Eric.Scott@Foth.com The Engineer's opinion of probable construction cost for the Work is $6,000,000

Post-Bid

Transportation Terminals

$6,000,000.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

88

14

4

6

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Compression Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Mercantile and Service Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Concrete Overlays, Fertilizing, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Soil Preparation, Turf and Grasses, Seeding, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers, Manufacturing Equipment, Dies and Molds, Molds, Mobile Plant Equipment, General Vehicles, Maintenance Vehicles
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
22
Bidding Soon
498
All Active Projects
271
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2024

October 7, 2024

img_map_placeholder

2121 Arthur Collins Pkwy SW, Cedar Rapids, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.