BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Window Rock, Arizona. Completed plans call for the renovation of a municipal facility.

**As of July 17, 2024 this project has not yet been awarded. A timeline for award has not yet been established. Questions relating to this request for proposals must be submitted in writing to the following (faxed or emailed questions are acceptable): Navajo Nation Facilities Maintenance Department Post Office Box 528 Fort Defiance, Arizona 86504 Attn.: Marcus C. Tulley Fax: 928-729-4258 Email: marcustulley@navajo-nsn.gov 1.) Window Rock, AZ Minerals Geologist (2) #2539 1,204 sq.ft. (3/12 Pitch) a) Removal of existing roof material and inspect the decking and replace of all aged or damaged material. b) Install metal pro panel commercial grade roofing systems with minimum of 26-gauge metal, and eave trims, ridge trims, roofjacks, mastic, seals, and felt paper, gable trims, and wood and metal screws **Contractor shall be responsible for inspecting the roofslope for material being used. Other option maybe considered and approved prior to installation. c) Removal of all debris to be disposed of. d) Thorough inspection ofroofinstallations. e) Bid Alternate 1. Separate Cost to be provided. 2) Window Rock, AZ Fleet Body Shop #2747 4,092 sq.ft. (5/12 Pitch) a) Removal of existing roof material and inspect the decking and replace of all aged or damaged material. b) Install metal pro panel commercial grade roofing systems with minimum of 26-gauge metal, and eave trims, ridge trims, roofjacks, mastic, seals, and felt paper, gable trims, and wood and metal screws **Contractor shall be responsible for inspecting the roofslope for material being used. Other option maybe considered and approved prior to installation. c) Removal of all debris to be disposed of. d) Thorough inspection ofroofinstallations e) Bid Alternate 2. Separate Cost to be provided. 3) Window Rock, AZ Fleet Auto Shop #2744 7,191 sq.ft. (3/12 Pitch) a) Removal of existing roof material and inspect the decking and replace of all aged or damaged material. b) Install metal pro panel commercial grade roofing systems with minimum of 26-gauge metal, and eave trims, ridge trims, roofjacks, mastic, seals, and felt paper, gable trims, and wood and metal screws **Contractor shall be responsible for inspecting the roofslope for material being used. Other option maybe considered and approved prior to installation. c) Removal of all debris to be disposed of. d) Thorough inspection ofroofinstallations. e) Bid Alternate 3. Separate Cost to be provided 4) Window Rock, AZ Department of Emergency Management #2518 1,440 sq.ft. (4/12 Pitch) a) Removal of existing roof material and inspect the decking and replace of all aged or damaged material. b) Install metal pro panel commercial grade roofing systems with minimum of 26-gauge metal, and eave trims, ridge trims, roofjacks, mastic, seals, and felt paper, gable trims, and wood and metal screws **Contractor shall be responsible for inspecting the roofslope for material being used. Other option maybe considered and approved prior to installation. c) Removal of all debris to be disposed of. d) Thorough inspection ofroofinstallations. e) Bid Alternate 4. Separate Cost to be provided. 5) Shiprock, NM FMD Maintenance Shop #S022 900 sq.ft (3/12 Pitch) a) Removal of existing roof material and inspect the decking and replace of all aged or damaged material. b) Install metal pro panel commercial grade roofing systems with minimum of 26-gauge metal, and eave trims, ridge trims, roofjacks, mastic, seals, and felt paper, gable trims, and wood and metal screws **Contractor shall be responsible for inspecting the roofslope for material being used. Other option maybe considered and approved prior to installation. c) Removal of all debris to be disposed of. d) Thorough inspection ofroofinstallations. 6) Teec Nos Pos, NM Food Distribution #3914 7,176 sq.ft. (4/12) a) Removal of existing roofmaterial and inspect the decking and replace of all aged or damaged material. b) Install metal pro panel commercial grade roofing systems with minimum of 26-gauge metal, and eave trims, ridge trims, roofjacks, mastic, seals, and felt paper, gable trims, and wood and metal screws **Contractor shall be responsible for inspecting the roofslope for material being used. Other option maybe considered and approved prior to installation. c) Removal of all debris to be disposed of. d) Thorough inspection ofroofinstallations. 7) Shiprock, NM Headstart/AGRI/Comm. #2483 6,171 sq.ft (1/12 Pitch) a) Removal of existing roof material and inspect the decking and replace of all aged or damaged material. b) Install metal pro panel commercial grade roofing systems with minimum of 26-gauge metal, and eave trims, ridge trims, roofjacks, mastic, seals, and felt paper, gable trims, and wood and metal screws **Contractor shall be responsible for inspecting the roofslope for material being used. Other option maybe considered and approved prior to installation. c) Install of building materials to create a 2/12 pitch. d) Removal of all debris to be disposed of. e) Thorough inspection ofroof installations 8) Crownpoint, NM Food Distribution Warehouse #2561 450 sq.ft (3/12 Pitch) a) Removal of existing roof material and inspect the decking and replace of all aged or damaged material. b) Install metal pro panel commercial grade roofing systems with minimum of 26-gauge metal, and eave trims, ridge trims, roofjacks, mastic, seals, and felt paper, gable trims, and wood and metal screws **Contractor shall be responsible for inspecting the roofslope for material being used. Other option maybe considered and approved prior to installation. c) Removal of all debris to be disposed of. d) Thorough inspection ofroof installations 9) Dilkon, AZ Dilkon Dist. Courthouse #5537 16,137 sq.ft. TPO Roofing a.) Remove existing TPO material and inspect the decking and drainage areas. Assess an alternative drainage method and location to address sand build up and drainage clogs. As a result ofthe changes in drainage methods, drainage flow will have to be redesign. b.) Install new base material and securely fasten before installing TPO membrane. c.) all penetrations shall be properly sealed and installed to avoid leaks. Including eave trims, ridge trims, roofjacks, mastic, seals, and felt paper, gable trims, and wood and metal screws **Contractor shall be responsible for inspecting the roofslope for material being used. Other option maybe considered and approved prior to installation. d.) Removal of all debris to be disposed of. e.) Thorough inspection ofroofinstallations. 10)Tohajiilee, NM Tohajiilee Courthouse #3908 4,200 sq.ft. TPO Roof a.) Remove existing TPO material and inspect the decking and drainage areas. Assess an alternative drainage method and location to address sand build up and drainage clogs. As a result ofthe changes in drainage methods, drainage flow will have to be redesign. b.) Install new base material and securely fasten before installing TPO membrane. c.) all penetrations shall be properly sealed and installed to avoid leaks. Including eave trims, ridge trims, roofjacks, mastic, seals, and felt paper, gable trims, and wood and metal screws **Contractor shall be responsible for inspecting the roofslope for material being used. Other option maybe considered and approved prior to installation. d.) Removal of all debris to be disposed of. e.) Thorough inspection ofroof installations. 11) Fort Defiance, AZ Forestry Administration #2466 4,000 sq.ft (3/12 Pitch) a) Removal of existing roofmaterial and inspect the decking and replace of all aged or damaged material. b) Install metal pro panel commercial grade roofing systems with minimum of 26-gauge metal, and eave trims, ridge trims, roofjacks, mastic, seals, and felt paper, gable trims, and wood and metal screws **Contractor shall be responsible for inspecting the roofslope for material being used. Other option maybe considered and approved prior to installation. c) Removal of all debris to be disposed of. d) Thorough inspection ofroofinstallations. 12) Tuba City, AZ Property Management #2842 4,200 sq.ft. (3/12 Pitch) a) Removal of existing roofmaterial and inspect the decking and replace of all aged or damaged material. b) Install metal pro panel commercial grade roofing systems with minimum of 26-gauge metal, and eave trims, ridge trims, roofjacks, mastic, seals, and felt paper, gable trims, and wood and metal screws **Contractor shall be responsible for inspecting the roofslope for material being used. Other option maybe considered and approved prior to installation. c) Removal of all debris to be disposed of. d) Thorough inspection ofroofinstallations. e) Bid Alternate 5. Separate Cost to be provided

Post-Bid

Municipal

$484,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
2
Bidding Soon
105
All Active Projects
32
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 7, 2024

July 1, 2024

img_map_placeholder

Multiple Locations, Window Rock, AZ

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.