BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Seffner, Florida. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) Selection Method : Expanded Letter of Response Financial Management Numbers : 44869816201 Project Description : I-4 Truck Parking Facility Plain Language Description : This project is for the Design, Permitting and Construction of the I-4 Truck Parking Facility and associated pedestrian and roadway improvements along I-4 and County Line Road in Hillsborough County. The facility will be constructed on a FDOT-owned 40-acre site. The I-4 Truck Parking Facility will provide 120 truck parking spaces with the ability to expand to 250 spaces in the future. The new facility will be incorporated into Florida's Truck Parking Availability System (TPAS) to provide drivers with real-time available parking information via mobile application and dynamic roadside signs. The project includes other infrastructure improvements that work in tandem to provide ease of access to the I-4 Truck Parking Facility. These include improvements to the I-4 eastbound and westbound ramps as well as County Line Road to provide easier access for trucks. The I-4 Truck Parking Facility also includes features and amenities to provide a high quality of service to commercial vehicle operators including sidewalk/bike paths to local restaurants and hotels. The parking Facility will also have restrooms, picnic shelters, and six electric (shore power) hook-ups to provide stand-by power for refrigerated trucks and auxiliary power for in-cab comforts including HVAC, entertainment systems, etc. Advertisement Date 5/07/2024 Response Deadline Date/Time 5/21/2024 02:30 am Longlist Date/Time 5/23/2024 07:30 pm Shortlist Selection Date/Time 5/28/2024 07:00 pm Technical Review Committee Meeting 1 Date/Time 5/30/2024 08:30 pm Final Selection Date/Time 6/10/2024 07:00 pm Negotiations Period Begin Date 6/20/2024 Negotiations Period Ending Date 7/19/2024 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - I-4 Truck Parking Facility

Conceptual

Roads / Highways

$3,336,327.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
59
Bidding Soon
1,318
All Active Projects
529
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2025

img_map_placeholder

I-4, Seffner, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.