BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Joliet, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This project generally includes removal and replacement of asphalt pavement, asphalt overlay, concrete driveway and sidewalk removal and replacement, and boardwalk construction. For additional information and to download Bid Documents, please visit our website. Participants must register in full to be eligible to receive addenda and to submit a bid. Bids must be submitted in accordance with the Contract Documents. Bids shall be accompanied by the proper bid security. The FOREST PRESERVE DISTRICT OF WILL COUNTY reserves the right to accept any bid or any part or parts or combinations thereof, to waive any informalities or irregularities, and to reject any or all bids. For questions regarding the project, contact Jason Buss at jbuss@fpdwc.org or 815-582-1619. For delivery of the bid documents, contact Elise Brazzale at ebrazzale@fpdwc.org or (815)722-9849. Award of Contract: Bids cannot be withdrawn for a period of sixty (60) days after bid opening. Bids will be reviewed by the Forest Preserve and presented to the Board of Commissioners for Award of Contract at their regular board meeting on June 13, 2024. The Forest Preserve will issue a written Notice of Contract Award to the successful Bidder. Execution of Contract: The successful Bidder will be required to execute a Contract with the Forest Preserve within 10 business days after receipt of the written Notice of Contract Award. Execution of the Contract shall include each of the following: A. Signing the Contract Agreement B. Submittal of a Performance, Material, and Payment Bond C. Submittal of a Certificate of Insurance D. Submittal of a Construction Schedule The Forest Preserve will issue a written Notice to Proceed upon Execution of the Contract. The Bid Security of the successful Bidder will be forfeited to the Forest Preserve as liquidated damages, not as penalty, when the successful Bidder fails to execute any part of the Contract within the specified time. The Forest Preserve reserves the option to accept any other Bid within 10 business days from such default. Such acceptance shall have the same effect on such Bidder as though he were the original successful Bidder. Commencement and Completion of the Work: Work shall begin within 10 business days of receipt of the written Notice to Proceed. Work shall be completed in accordance with the Contract Documents by August 30, 2024, as provided in the General Conditions, Article IV, Section 4.4. Small Business Enterprise Initiative: The Forest Preserve is committed to supporting "Small Businesses", "Minority Business Enterprises", "Female Business Enterprises", and "Persons with Disabilities Enterprises," as those terms are defined under Illinois law. The Forest Preserve has set a goal to secure up to 16% of the contracted amount for contracted services and improvement projects to such disadvantaged businesses. Such businesses are strongly encouraged to bid on Forest Preserve contracts

Post-Bid

Roads / Highways

$1,395,000.00

Public - County

Paving, Site Work

17

7

37

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
395
Active Projects
174
Bidding Soon
3,031
All Active Projects
1,324
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 20, 2024

July 19, 2024

August 30, 2024

img_map_placeholder

Rock Run Greenway Trail, Joliet, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.