Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a bridge / tunnel in Lancaster, South Carolina. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
SC File NO(S).: 2968580 PCN: P038287 Project No.: P038287 Approx. Length (miles): 0.2180 CO(S).: Lancaster The Contractor's attention is called to the requirements of the SC Department of Transportation for Prequalification. Only contractors who have been issued a prequalification certificate by the sc department of transportation will be allowed to submit bids. Information concerning prequalification can be obtained at the Contracts Administration office, Room 332 in the Headquarters building, 955 Park Street, Columbia, SC, or by contacting Maria Devito at (803)737-2043 or Prequal@scdot.org. Unless otherwise indicated in the advertisement, no proposal will be considered unless accompanied by a bid bond in the amount of 5% of the Approximate bid amount, written by a surety satisfactory to the Department, properly executed in South Carolina Department of Transportation Form 674 (furnished by the Department in each proposal). If an electronic bond is utilized, the Bond ID number must be provided on the Surety 2000 or SurePath Network electronic bond form. No other form of proposal guaranty will be accepted. Visitors are welcome and should sign in at the Park Street entrance. Please contact the Contract Administration Office at (803)737-1249 with all Letting related questions. The south Carolina department of transportation reserves the right to reject any or all proposals and waive any technicalities. SC DOT - 040 - S-195 (New Cut Church Rd) Bridge Replacement Over Camp Creek The following claims procedure covers all claims for additional time or compensation arising under this contract. The claims procedure is non-binding and is a condition precedent to litigation or any other form of dispute resolution. All communications, testimony, and all documents prepared for this procedure by either party from the time of filing the CERTIFICATE OF CLAIM, per section 105.16.8 of the 2007 Standard of Specifications for Highway Construction, to the conclusion of the procedure shall be deemed to be settlement negotiations and not admissible in litigation or any other dispute resolution procedure. If at the conclusion of this procedure the claim has not been resolved, litigation may be pursued through the South Carolina Circuit Court for Richland County. Contractor waives all rights to a jury trial and agrees that all litigation matters shall be heard non-jury and venue for any action shall be in the South Carolina Circuit Court for Richland County. Furnish all required labor, equipment, and materials and perform all operations necessary for installing anchors and dowels in concrete using an adhesive bonding system in accordance with the details shown on the Plans and with the requirements of this Specification. Provide a material system specifically intended for use in structural applications for bonding anchors and dowels to hardened concrete. Limit applications to anchors and dowels installed in horizontal, vertical, and downwardly inclined positions. Do not use adhesive anchors in overhead or upwardly inclined installations. Furnish all required labor, equipment, and materials and perform all operations necessary for installing the elastomeric concrete in accordance with the details shown on the Plans and with the requirements of this Specification. F&ME performed a geotechnical subsurface exploration and laboratory testing for the bridge and roadway portion of the project. The South Carolina Department of Transportation (SCDOT) request and scope for the geotechnical subsurface investigation was issued on June 12, 2019. A subsequent laboratory testing scope was issued on August 23, 2019. Copies of these requests can be found in Section 8 of the Appendix of this report. The field investigation consisted of Soil Test Borings (STB) with Standard Penetration Testing (SPT), bulk soil sampling, and auger borings with Shelby Tube sampling. Laboratory testing was performed on soil samples collected from the soil test borings, bulk samples, and undisturbed samples. All exploration methods and laboratory procedures were conducted in general accordance with the current American Association of State Highway and Transportation Officials (AASHTO), American Society of Testing and Materials (ASTM) Standards, and the SCDOT Geotechnical Design Manual (GDM). This report was prepared in general accordance with the 2019 SCDOT Geotechnical Design Manual (GDM), Version 2.0. At the request of F&ME Consultants, GRL Engineers conducted SPT energy measurements in general accordance with ASTM D4633-10 during SPT sampling at a site near the intersection of Lowrys Highway and Hardin Strait Rd in Chester County, South Carolina. Energy measurements on the three rigs were taken during five sampling events at five-foot intervals in dummy soil borings. The starting depth was 28.5 feet for each of the rigs, and ending depth was 50 feet below the existing ground surface. The SPT samples were driven for a total of three, 6 inch increments, or 1.5 feet, and the blow counts for each increment were recorded.
Post-Bid
Bridges / Tunnels
$2,000,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 11, 2024
August 12, 2024
New Cut Church Rd, Lancaster, SC
Related To This Project
Lancaster, SC
Bid Date: Jun 06 2024
Lancaster, SC
Bid Date: Jun 13 2024
Lancaster, SC
Bid Date: May 24 2024
Lancaster, SC
Bid Date: Sep 12 2024
Lancaster, SC
Bid Date: Jun 10 2024
Lancaster, SC
--
Lancaster, SC
--
Lancaster, SC
Bid Date: Jul 11 2024
Lancaster, SC
Bid Date: Apr 23 2024
Lancaster, SC
Bid Date: Oct 22 2024
Lancaster, SC
Bid Date: Apr 24 2024
Lancaster, SC
Bid Date: Nov 10 2020
Lancaster, SC
Bid Date: Apr 11 2024
Lancaster, SC
Bid Date: Mar 21 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.