BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 9, 2024 at 8:00 PM

Updated May 25, 2024

This is a service / maintenance or supply contract in Los Angeles, California. Contact the soliciting agency for additional information.

The City of Los Angeles, Bureau of Engineering (BOE), is seeking a consultant to assess all existing City of Los Angeles corrugated metal pipe and generate a report that will assess, prioritize, and recommend how to proactively repair these assets over the next 10 years. Any subconsultants that have been added to the contract and not originally a part of Schedule A must be registered with RAMP. This TOS is only applicable to the firms on the Pre-Qualified On-Call Wastewater and Environmental Engineering Services Consultants List. The purpose of this TOS is to solicit engineering services from one (1) consultant engineering firm (Consultant) to develop an assessment report of existing corrugated metal pipe infrastructure in the City (Project). The intent of the assessment is to assess the structural condition of existing CMP, develop a prioritization plan with repair recommendations, and generate cost estimates of the repairs. The Project will require separate sets of deliverables including an outline of the assessment report, draft assessment reports, and a final assessment report The Consultant shall be required to provide a complete, comprehensive, and thorough assessment report that will enable the BOE and LASAN to prioritize the repairs of existing CMP infrastructure within the City, over the next 10 years. Considering the time involved in evaluating the City's large CMP infrastructure, the assessment shall be conducted by utilizing a statistical representative sample of the CMP system and extrapolating the results throughout the study area. Question Submittal Deadline 4/26/2024 Response to Questions 5/3/2024 The 50% Assessment Report shall be completed by the deadline of September 30, 2024 The anticipated participation levels for this TOS are 18% MBE, 4% WBE, 25% SBE, 8% EBE, and 3% DVBE. The proposal shall include a complete Task Work Order List of Subconsultants Form (Schedule B), see Attachment A.

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
673
Active Projects
303
Bidding Soon
3,321
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2024

June 24, 2024

Project location map

Multiple Locations, Los Angeles, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.