BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 1, 2024 at 8:00 PM

Updated July 2, 2024

Site work and new construction of a municipal facility in Akron, Ohio. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

New Visitor Center Contract Estimated Cost General Contract $4,832,000 Alternate 1 $40,000 EDGE Participation Goal: 5% of contract Domestic steel use is required per ORC 153.011. Installation of computer systems in industrial applications such as assembly lines, robotics, computer controller manufacturing systems. Installation of conduit and/or raceways shall be installed by Inside Wireman . On sites where there is no Inside Wireman employed, the Teledata Technician may install raceway or conduit not greater than 10 foot. Fire Alarm work is excluded on all new construction sites or wherever the fire alarm system is installed in conduit. All HVAC control work

Post-Bid

Municipal

$4,832,000.00

Public - State/Provincial

New Construction, Site Work

80

26

27

8

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
245
Active Projects
142
Bidding Soon
2,309
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2024

July 29, 2024

Project location map

To Be Determined, Akron, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.