Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a detention facility in Oakdale, Minnesota. Conceptual plans call for the renovation of a detention facility.
As of September 26, 2024, per owner, there are no future plans for this project. Community Corrections seeks to use the unoccupied space at 297 Century Ave, reconfiguring it to co- locate two unique and separate institutions: the Ramsey County Correctional Facility and the Juvenile Detention Center (JDC). The current Juvenile Detention Center is housed at the JFJC in downtown St Paul. The structure is old, difficult to maintain and reflects an outdated detention modality. The rooms are dark and dungeon-like with little natural light and no green space for youth to recreate. Additionally, the disjointed layout and location of the existing facility contributes to difficulty recruiting and retaining staff. The facility is spread out over four different floors, requiring additional staff to ensure client safety and building security; parking for staff and families is challenging and staff do not feel safe- there have been assaults and shots fired outside the facility and theft from staff vehicles. Lastly there is no formal admissions area. The Ramsey County Correctional Facility is, located in Maplewood MN currently has unoccupied space due to successful efforts to reduce the population over the last several years. The available space in what is currently the Women's Unit is newer and in better condition. Rooms are larger and have more natural light. There is ample green space for outdoor recreation. There is free parking for families and staff. There is an existing admissions area that could be built out to create a drop in center so youth would not enter detention prior to assessment and determining if there are appropriate community alternatives to keep incoming youth separate from the facility and collaborate with Health and Wellness Team partners to divert low risk risk that are in need of other services. Lastly, the existing onsite staff provide a higher standard of janitorial and maintenance services than is provided by contracted service at the JDC. The majority of JDC residents are youth of color from lower income families. Also, many youth are now staying at the JDC longer due to the seriousness of their offences and the lack of viable placement options. Having a more therapeutic and child friendly space would align with the county's Residents First Strategic Priority and would provide a safer environment for the youth and staff.
Project Abandoned
Jails / Prisons
$19,375,000.00
Public - County
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 27, 2024
297 Century Ave N, Oakdale, MN
Related To This Project
Oakdale, MN
--
Oakdale, MN
--
Oakdale, MN
Bid Date: Oct 03 2024
Oakdale, MN
--
Oakdale, MN
Bid Date: Nov 26 2024
Oakdale, MN
Bid Date: Apr 23 2024
Oakdale, MN
Bid Date: May 15 2024
Oakdale, MN
Bid Date: Apr 11 2024
Oakdale, MN
Bid Date: Apr 11 2024
Oakdale, MN
Bid Date: Apr 11 2024
Oakdale, MN
Bid Date: Mar 12 2024
Oakdale, MN
Bid Date: Apr 15 2021
Oakdale, MN
Bid Date: Feb 06 2024
Oakdale, MN
Bid Date: Jun 20 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.