BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a bridge / tunnel in Linn Creek, Missouri. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Question Deadline 05/28/2024 The contractor questionnaire must be on file 7 days prior to bid opening The proposed work includes a new 162-0, three-span bridge, with prestressed concrete slabs, steel piling (HP 12x53), concrete abutments, concrete pile encasement walls, concrete bump curbs, traffic control, and all appurtenances. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2019 Edition including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. The right is reserved to reject any or all bids. A certified or cashiers check or a bid bond in the amount of 5% shall be submitted with each proposal. The DBE goal for this project is 3%. No 2nd tier subcontracting will be allowed on this project. The Contract, if awarded, will be awarded to the lowest responsive, responsible bidder who provides the lowest price complying with the Conditions of the Contract Documents within the Owner's budget. MODOT - Constructing Bridge No. 16000281

Award

Bridges / Tunnels

$9,000,000.00

Public - County

New Construction, Paving, Site Work

32

6

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
53
Bidding Soon
732
All Active Projects
319
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 4, 2024

August 5, 2024

May 1, 2025

img_map_placeholder

Multiple Locations, Linn Creek, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.