BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Marshfield, Missouri. Working plans call for site work for a road / highway.

**As of June 11, 2024, no bids received. No definite date for the rebid.** PURPOSE AND INTRODUCTION The City of Marshfield ("City") is seeking bids from qualified Contractors for the repainting of crosswalks, parking spaces, stop bars, centerline, and turn arrows on various streets in the City of Marshfield, MO ("Project"). Specific locations are included in Scope of Services. Scope This project will consist of the installation of yellow paint for pavement markings for centerlines, white paint for crosswalk markings, stop bars, turn arrows and parking stall lines, and blue paint for ADA parking stall lines and universal symbols. The total project will consist of the following locations. Intersections: o Banning and Church Street (135' of double yellow and 45' white, 2 stop bars, 2 turn arrow) o N. Pine and Hubble Dr. (400' of double yellow and 210' white, 2 stop bars, 2 turn arrows) o N. Elm and Hubble Dr. (120' of double yellow and 45' white, 3 stop bars, 2 turn arrows) o Jefferson and Hubble Dr. (120' of double yellow and 40' white, 2 stop bars, 2 turn arrows Crosswalks: o Elm Street and Madison o Elm Street and State Highway "DD" o Elm Street and St. Charles Street o Elm Street and Burford Street o Elm at R.H. Barr Football Stadium o Locust and Blinn Street (2 total) o Around Square (5 total) Downtown Square Markings: o South Marshall Street - 15' yellow painted curb, 220' double yellow center line, 9 parking spaces and 1 loading zone. o East Washington Street - 40' yellow painted curb, 240' double yellow center line, 14 parking spaces, 1 handicap parking space and symbol (Painted Blue). o South Crittenden - 40' yellow painted curb, 240' double yellow center line, 16 parking spaces. o North Crittenden - 25' yellow painted curb, 160' double yellow center line, 6 parking spaces. o East Madison Street - 30' yellow painted curb, 250' double yellow center line, 10 parking spaces and 1 loading zone. o East Jefferson Street - 230' double yellow center line, 15 parking spaces. o North Marshall Street - 160' double yellow center line, 5 parking spaces, 1 handicap parking space and symbol (Painted Blue). o North Clay Street - 100' yellow painted curb, 150' double yellow center line, 11 parking spaces, 1 handicap parking space and symbol (Painted Blue). o West Jefferson Street - 15' yellow painted curb, 220' double yellow center line, 10 parking spaces. o West Washington Street - 40' yellow painted curb, 230' double yellow center line, 28 parking spaces,1 handicap parking space and symbol (Painted Blue). o West Madison Street - 35' yellow painted curb, 215' double yellow center line, 17 parking spaces and 1 loading zone. o South Clay Street - 20' yellow painted curb, 210 double yellow center line, 16 parking spaces. o Inside Square - 55 angled parking spaces. o Outside Square - 56 angled parking spaces. o Around Square - 4 Route 66 symbols. Any questions concerning this RFP may be submitted via phone conversation or in writing via mail, or email, on or before May 10, 2024 to: Sam Rost City Administrator Attn: 2023 Intersections, Crosswalks, & Downtown Square Marking Program 798 S. Marshall Marshfield, MO 65706 Email: samrost@marshfieldmo.gov 11. Maintenance Bond: The Contractor shall procure and maintain a Maintenance Bond in the amount of 10% of the final Contract Sum after any and all Change Orders and/or formal contract amendments. The Maintenance Bond shall be in full force for a one (1) year guarantee period from the date of final acceptance. Final payment will not be made until the City receives the Maintenance Bond. The Bond shall serve to ensure required maintenance of the Project will be provided throughout the maintenance period. 12. Bond Premiums: The premiums on all the bonds shall be paid by the Contractor 13. Notice to Proceed: Upon submittal and acceptance of all items as outlined in the Notice of Award, the successful bidder will receive Notice to Proceed a. The City will issue the contractor a tax exemption letter and a project exemption certificate. These documents are to be given to the Contractor's suppliers and used only for the specific project identified and will expire on the date indicated unless renewed by the City. b. The Contractor shall not commence work prior to the date of written notice from the City and shall complete all work before July 1, 2023. Notice to Proceed is expected to be May 26, 2023.

Final Planning

Roads / Highways

$19,663.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
14
Bidding Soon
272
All Active Projects
102
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2024

December 21, 2024

img_map_placeholder

Multiple Locations, Marshfield, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.