BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in San Jose, California. Completed plans call for site work for a water / sewer project.

The Project generally involves constructing approximately 750ft of water transmission mains on Bayberry Ln in Evergreen to improve system reliability. The scope of work for this project includes new installation of 6-inch Ductile Iron Pipe (DIP) potable water mains to replace existing asbestos cement pipe. All prospective bidders are hereby cautioned that the Contractor's State License Law regulates contractor licensing matters. The Contractor, in its bid proposal, shall be required to disclose its license type, number, and expiration date. Bidders must have a valid California contractor's license, classification A or C-34, to bid this project. The contractor and all designated subcontractors must be registered with the Department of Industrial Relations in accordance with California Labor Code Sections 1725.5 and 1771.1. The City will not accept a bid in which the contractor or any of the designated subcontractors are not registered in accordance with Sections 1725.5 and 1771.1. See Section 2-1.17 of the Special Provisions for the "registration" requirements applicable to the contract. This project is a "public works" as defined in Sections 1720 through 1720.6 of the California Labor Code. In accordance with Chapter 14.09 of the San Jose Municipal Code entitled "Prevailing Wage Requirements for City Contracts Involving Public Works," the contractor will be required to comply with the prevailing wage provisions in California Labor Code Sections 1720 through 1861, and the City's Office of Equality Assurance is authorized to provide certain local enforcement of those provisions. As such, the contractor will need to pay not less than the general prevailing rate of per diem wages and the general prevailing rates for holiday and overtime work. The Nondiscrimination/Non preferential Treatment requirements of Chapter 4.08 of the San Jose Municipal Code apply to this project. Each bid must be accompanied by an electronic pdf copy of a bidder's bond in the sum of not less than 10% of the total aggregate amount of the bid. Bonds must be issued by a surety that is an "admitted surety insurer" in the State of California and must name the City of San Jose as beneficiary. Bonds must be accompanied by an electronic pdf copy of the surety's power of attorney and a notary acknowledgement for the surety's signature. Bidders must retain the original wet-signed bidder's bond and provide it to the City upon request. Question Deadline 05/16/2024 at 11:00 AM PT Bidders must submit questions or requests for information concerning any part of this bid in writing to the City via online. The City will not respond to any communication or question submitted directly to City staff or City consultants. Submit questions via online no later than. Bidders must submit with its bid valid Certificate(s) of Reported Compliance for itself and all designated subcontractors in accordance with California Code of Regulations, Title 13, Div. 3, Ch. 9, Art. 4.8, Sec. 2449, General Requirements for In-Use Off-Road Diesel-Fueled Fleets ("CARB Regulations"). Each bid must either include all applicable Certificate(s) of Reported Compliance as described in Section 2449(n) of the CARB Regulations for any vehicles which may be used in performance of this contract or provide detailed reasoning demonstrating that the fleet(s) is/are exempt from such regulations. Bidder's attention is directed to those provisions of the Specifications which require the contractor to whom the contract for the work is awarded, to file with the City Clerk at the time the contract is executed, a Contractor's Payment Bond and a Bond for Faithful Performance meeting all the requirements of the Specifications and approved by the City Attorney of the City of San Jose. Bonds must be issued by a surety that is an "admitted surety insurer" in the State of California possessing a power of attorney and shall name the City of San Jose as beneficiary. The Contractor's Faithful Performance Bond shall be for 100% of the contract amount. The Contractor's Payment Bond shall be for 100% of the contract amount.

Award

Water / Sewer

$428,625.00

Public - City

Site Work

9

10

3

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
43
Bidding Soon
1,452
All Active Projects
633
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2024

June 24, 2024

img_map_placeholder

Bayberry Ln, San Jose, CA

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.