BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a bridge / tunnel in Marionville, Missouri. Working plans call for site work for a bridge / tunnel.

The Buck Prairie Special Road District is requesting bids for the removal and replacement of a large box concrete culvert on Farm Road 1232. This is the second culvert South of the FR 2160 and FR 1232 intersection. This is a bid only for the labor involved with the removal and replacement of the culvert. The Road District will be suppling the culverts and other necessary material. Replacement culverts will be approximately 8'x3'x6' sections and project will require the removal of the current culverts and installation of approximately 14 sections of the replacement culvert. The culvert removal and installation may be a separate bid from the below listed concrete installation. This project will require approximately 70 to 80 cubic yards of rock and concrete to be placed on top, the wing sides of the culverts and road approaches. The concrete work may be a separate bid only for the labor involved with the installation of the concrete to the culverts and approaches. The Road District will be supplying the rock, concrete and other necessary material. For more information contact Road Commissioner Chris Kutzner at 417-840-0758. The contractor is required to carry liability, workman compensation, and any other required insurance in sufficient amounts (as determined by the Road Commissioners, currently One Million Dollars for liability insurance) for coverage of any damages caused by the contractor to property of any other person or the Road District. Evidence of sufficient insurance will be required by the Road District Commissioners prior to successful acceptance of this bid. The Road District also requests that each bidder provide their normal hourly rate with their bid. The Buck Prairie Special Road District reserves the right to accept or reject any or all bids for any reason.

Final Planning

Bridges / Tunnels

$600,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
29
Bidding Soon
416
All Active Projects
162
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2024

June 27, 2024

img_map_placeholder

To Be Determined, Marionville, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.