Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Libertyville, Illinois. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; and road / highway.
**As of June 27, 2024, project was awarded to Peter Baker & Son awarded amount is $346,076.60.** 2024 Road Program Site Address: 18421 W Wood Hollow Ln Subcontracting portions of the work will be allowed pursuant to Section 108.01 of the "Standard Specifications for Road and Bridge Construction", Illinois Department of Transportation, latest edition. The Owner reserves the right to reject any bidder or subcontractor who, in the opinion of the Owner or the Engineer, does not have adequate experience, personnel or equipment to perform the work in a timely, efficient and satisfactory manner. The Owner reserves the right to reject any and all bids or any part thereof and waive any informality or any irregularities or defects in any or all proposals and to accept that bid which in its opinion is in the best interest of the Owner. Any such decision shall be considered final. It is the intent of the Owner to award a contract to the lowest responsible, responsive bidder. The work is located in Bull Creek Subdivision in unincorporated Libertyville, IL. The work for which proposals are invited will consist of, in general, but shall not be limited to, the following: minor culvert replacements, HMA patching, HMA surface removal, HMA binder & surface placement, and related work. Bid security in the form of a Bid Bond for five percent (5%) of the total bid made payable to the Libertyville Township Road District shall accompany the bid. The work shall be prosecuted in such a manner and with such a supply of materials, equipment and labor as is considered necessary to ensure its completion according to the time specified in the Contract. The Contractor shall be completed on or before Friday, September 13, 2024 as described in Article 108.05 of the Standard Specifications. In case of failure to complete the work on time, the provisions of Article 108.09 of the Standard Specifications. If the Engineer deems it proper or necessary during the execution of the work to make any alteration which will increase or diminish the quantity of labor or material or the expense of the work, even to the elimination of one or more items, such alteration shall not annul or vitiate the Contract hereby entered into. The elimination of any part of the work shall not increase the unit price for any of the remaining work bid on. The value of the work so added shall be based on the rates and prices named in the Contract as bid, when such rates and prices cover the class of work added, otherwise the value shall be determined by mutual written agreement between the Owner and the contractor before any such work shall be commenced.
Award
Bridges / Tunnels
$346,077.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 23, 2024
June 24, 2024
18421 W Wood Hollow Ln, Libertyville, IL
Related To This Project
Libertyville, IL
Bid Date: Jun 14 2024
Libertyville, IL
Bid Date: Jul 09 2024
Libertyville, IL
Bid Date: Jun 27 2024
Libertyville, IL
Bid Date: Jul 08 2024
Libertyville, IL
Bid Date: Jul 09 2024
Libertyville, IL
Bid Date: Aug 16 2024
Libertyville, IL
Bid Date: Nov 05 2024
Libertyville, IL
Bid Date: Jul 26 2024
Libertyville, IL
Bid Date: May 14 2024
Libertyville, IL
Bid Date: May 14 2024
Libertyville, IL
--
Libertyville, IL
Bid Date: May 01 2024
Libertyville, IL
Bid Date: Apr 23 2024
Libertyville, IL
Bid Date: Apr 16 2024
Libertyville, IL
Bid Date: Apr 18 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.